WELL · 42-057-31242 · DISTRICT 2
State Tract 26 #5
Calhoun County · Lavaca Bay (F-39) field · Vertical
State Tract 26 #5 (API 42-057-31242) is a plugged well in Calhoun County, plugged January 29, 2011, last operated by Neumin Production Company.
The RRC has issued 2 drilling permits between 1983 and 1999, permitted to 11,500 ft.
Completion filings report 5 formation tops, including Anahuac, Frio, Top Melbourn, Top (F-39).
Operator of record
- Based in
- Point Comfort, TX
- P-5 status
- Delinquent (D)
- P-5 last filed
- Aug 9, 2023
- Permits on file
- 380
- Phone
- (361) 987-7000
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Neumin Production Company |
| Production reports | Neumin Production Companythrough Nov 2008 |
| Latest permit | Neumin Production CompanyAug 6, 1999 |
- 11,500
- total depth, ft
- 2
- permits on file
- Aug 6, 1999
- last permit issued
- Jul 9, 1983
- completed
- 0
- cumulative oil, bbl
- 3.04M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jan 2011
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jul 9, 1983
- Shut in
- —
- Plugged
- Jan 29, 2011
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| State Tract 26 G-2-174754 | Lavaca Bay (F-36) | Neumin Production Company | 1 | 0 | 2.49M | Apr 1999 – Jan 2011 |
| State Tract 26 G-2-107506 | Lavaca Bay (F-39) | Neumin Production Company | 1 | 0 | 555K | Jan 1993 – Apr 1999 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Neumin Production CompanyJan 1993 → Nov 2008
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 486145-99 | Recompletion | Neumin Production Company | Jul 26, 1999 | Aug 6, 1999 | Mar 25, 1999 | 9,908 |
| 188329-99 | Drill | Neumin Production Company | Mar 14, 1983 | Mar 14, 1983 | May 9, 1983 | 11,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-107506 | — | — | — | — |
| — | — G-2-174754 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 17 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 9,872 | 9,890 | Perforated |
| 10,322 | 10,348 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 16 | 96 | — | — |
| 10.75 | 1,801 | 14.75 | — |
| 7.625 | 8,880 | 9.875 | — |
| 2.375 | 9,940 | — | — |
| 5.5 | — | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 30, 2000 | Apr 28, 1999 | — |
| 00 | Jan 6, 2000 | Jul 13, 1999 | Yes |
| 00 | Nov 12, 1999 | — | — |
| 00 | Jan 12, 1984 | Aug 4, 1983 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-057-31242 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-057-31242 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/05731242, documented in the API reference.