WELL · 42-057-31370 · DISTRICT 2
Aluminum Co. of America (Fee) #11
Calhoun County · Lavaca Bay (F-40-B) field · Vertical
Aluminum CO. Of America (Fee) #11 (API 42-057-31370) is a plugged well in Calhoun County, plugged May 18, 2011, last operated by Neumin Production Company.
The RRC has issued 5 drilling permits between 1985 and 2000, permitted to 14,000 ft.
Completion filings report 11 formation tops, including Frio, F-30, F-30 Sand, F-43.
Operator of record
- Based in
- Point Comfort, TX
- P-5 status
- Delinquent (D)
- P-5 last filed
- Aug 9, 2023
- Permits on file
- 380
- Phone
- (361) 987-7000
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Neumin Production Company |
| Production reports | Neumin Production Companythrough Mar 2011 |
| Latest permit | Neumin Production CompanyNov 20, 2000 |
- 14,000
- total depth, ft
- 5
- permits on file
- Nov 20, 2000
- last permit issued
- Sep 20, 2000
- completed
- 0
- cumulative oil, bbl
- 552K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH May 2011
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Sep 20, 2000
- Shut in
- —
- Plugged
- May 18, 2011
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 4 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Aluminum Co. of America (Fee) G-2-181655 | Lavaca Bay (F-40-B) | Neumin Production Company | 1 | 0 | 287K | Sep 2000 – May 2011 |
| Aluminum Co. of America (Fee) G-2-153643 | Lavaca Bay (F-49) | Neumin Production Company | 1 | 0 | 179K | Mar 1995 – Sep 2000 |
| Aluminum Co. of America (Fee) G-2-140015 | Lavaca Bay (F-40-A) | Neumin Production Company | 1 | 0 | 86.2K | Jan 1993 – Mar 1995 |
| — G-2-121498 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Neumin Production CompanyJan 1993 → Mar 2011
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 501650-99 | Recompletion | Neumin Production Company | Nov 6, 2000 | Nov 20, 2000 | Sep 20, 2000 | 12,000 |
| 433677-99 | Recompletion | Neumin Production Company | Mar 10, 1995 | Mar 15, 1995 | Feb 23, 1995 | 11,909 |
| 391741-99 | Recompletion | Neumin Production Company | Sep 9, 1991 | Sep 17, 1991 | May 7, 1991 | 12,103 |
| 303049-99 | Recompletion | Neumin Production Company | Jun 6, 1986 | Jun 10, 1986 | — | 14,000 |
| 270102-99 | Drill | Neumin Production Company | Mar 20, 1985 | Mar 20, 1985 | Mar 27, 1985 | 14,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Sep 20, 2000 | Aluminum Co. of America (Fee) G-2-181655 | Lavaca Bay (F-40-B) | Neumin Production Company | Plugged | — |
| Mar 3, 1995 | Aluminum Co. of America (Fee) G-2-153643 | Lavaca Bay (F-49) | Neumin Production Company | Plugged | — |
| Jul 16, 1991 | Aluminum Co. of America (Fee) G-2-140015 | Lavaca Bay (F-40-A) | Neumin Production Company | Plugged | — |
| May 29, 1986 | Aluminum Company of America Fee G-2-121498 | Lavaca Bay (12500) | Neumin Production Company | Plugged | — |
| May 18, 1985 | Aluminum Company of America G-2-117155 | Lavaca Bay (12 800) | Neumin Production Company | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 17 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 10,489 | 10,494 | Perforated |
| 10,540 | 10,558 | Perforated |
| 11,826 | 11,840 | Perforated |
| 12,514 | 12,524 | Perforated |
| 12,526 | 12,529 | Perforated |
| 12,532 | 12,540 | Perforated |
| 12,546 | 12,558 | Perforated |
| 12,800 | 12,820 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 2,500 | 17.5 | 1,986 S |
| 9.625 | 9,300 | 12.25 | 700 S |
| 5 | 13,198 | 8.5 | 1,400 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 14, 2002 | Jan 31, 2001 | Yes |
| 00 | Apr 5, 2001 | — | — |
| 00 | Apr 4, 1996 | Apr 5, 1995 | Yes |
| 00 | Apr 13, 1995 | — | — |
| 00 | Feb 13, 1992 | Sep 10, 1991 | Yes |
| 00 | Dec 11, 1991 | — | — |
| 00 | Jul 14, 1986 | Jun 12, 1986 | Yes |
| 00 | Jul 2, 1986 | — | Yes |
| 00 | Aug 6, 1985 | Jun 17, 1985 | — |
| 00 | Jul 17, 1985 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-057-31370 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-057-31370 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/05731370, documented in the API reference.