TEXAS · WELLS · CALHOUN COUNTY · STATE TRACT 38 LEASE · API 42-057-31393 · DISTRICT 02
State Tract 38 #5
Calhoun County · Lavaca Bay (F-43) field · Vertical
State Tract 38 #5 (API 42-057-31393) is a plugged well in Calhoun County, plugged June 7, 2003, last operated by Neumin Production Company.
The RRC has issued 3 drilling permits between 1985 and 1987, permitted to 14,000 ft.
Completion filings report 5 formation tops, including Frio, Kopnicky, Tex-Miss, F-50.
Operator of record
- Based in
- Point Comfort, TX
- P-5 status
- Delinquent (D)
- P-5 last filed
- Aug 9, 2023
- Permits on file
- 380
- Phone
- (361) 987-7000
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Neumin Production Company |
| Production reports | none |
| Latest permit | Neumin Production CompanyNov 16, 1987 |
- 14,000
- total depth, ft
- 3
- permits on file
- Nov 16, 1987
- last permit issued
- Nov 9, 1987
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jun 2003
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Nov 9, 1987
- Shut in
- —
- Plugged
- Jun 7, 2003
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| State Tract 38 G-2-125710 | Lavaca Bay (F-43) | Neumin Production Company | 1 | 0 | 0 | Jan 1993 – Jun 2003 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 338757-99 | Recompletion | Neumin Production Company | Nov 12, 1987 | Nov 16, 1987 | — | 13,333 |
| 296931-99 | Recompletion | Neumin Production Company | Jan 27, 1986 | Feb 5, 1986 | — | 14,000 |
| 283119-99 | Drill | Neumin Production Company | Aug 22, 1985 | Aug 22, 1985 | Aug 28, 1985 | 14,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Nov 9, 1987 | State Tract 38 G-2-125710 | Lavaca Bay (F-43) | Neumin Production Company | Plugged | — |
| Jan 17, 1986 | State Tract 38 G-2-119953 | Lavaca Bay (F-46) | Neumin Production Company | Plugged | — |
| Oct 19, 1985 | State Tract 38 G-2-119188 | Lavaca Bay (F-50) | Neumin Production Company | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 19 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 10,556 | 10,562 | Perforated |
| 11,080 | 11,088 | Perforated |
| 12,040 | 12,060 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 20 | 50 | — | — |
| 13.375 | 2,500 | 17.5 | 1,690 S |
| 9.625 | 9,350 | 12.25 | 630 S |
| 5 | 13,324 | 8.25 | 1,530 S |
| 5 | 13,333 | 8.5 | 1,530 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 31, 1987 | Nov 24, 1987 | Yes |
| 00 | Dec 8, 1987 | — | — |
| 00 | Mar 7, 1986 | Jan 31, 1986 | Yes |
| 00 | Mar 1, 1986 | — | — |
| 00 | Jan 15, 1986 | Nov 27, 1985 | — |
| 00 | Dec 14, 1985 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-057-31393 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-057-31393 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/05731393, documented in the API reference.