WELL · 42-057-31415 · DISTRICT 2
Aluminum Company of America Fee #12
Calhoun County · Lavaca Bay (F-49) field · Vertical
Aluminum Company Of America Fee #12 (API 42-057-31415) is a plugged well in Calhoun County, plugged May 3, 2011, last operated by Neumin Production Company.
The RRC has issued 2 drilling permits (amended once) between 1986 and 1991, permitted to 14,000 ft.
Completion filings report 4 formation tops, including Frio, Top Tex Miss, Top Tex-Miss, Vicksburg.
Operator of record
- Based in
- Point Comfort, TX
- P-5 status
- Delinquent (D)
- P-5 last filed
- Aug 9, 2023
- Permits on file
- 380
- Phone
- (361) 987-7000
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Neumin Production Company |
| Production reports | Neumin Production Companythrough Jun 2009 |
| Latest permit | Neumin Production CompanyMay 24, 1991 |
- 14,000
- total depth, ft
- 3
- permits on file
- May 24, 1991
- last permit issued
- Nov 3, 1986
- completed
- 0
- cumulative oil, bbl
- 1.71M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH May 2011
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Nov 3, 1986
- Shut in
- —
- Plugged
- May 3, 2011
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Aluminum Co. of America (Fee) G-2-138656 | Lavaca Bay (F-39) | Neumin Production Company | 1 | 0 | 1.71M | Jan 1993 – May 2011 |
| — G-2-122734 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Neumin Production CompanyJan 1993 → Jun 2009
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 387932-99 | Recompletion | Neumin Production Company | May 14, 1991 | May 24, 1991 | Mar 25, 1991 | 13,100 |
| 305736-98 | Drill | Neumin Production Company | Nov 25, 1986 | Aug 27, 1986 | — | 13,100 |
| 305736-99 | Drill | Neumin Production Company | Aug 27, 1986 | Aug 27, 1986 | Sep 6, 1986 | 14,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-122734 | — | — | — | — |
| — | — G-2-138656 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 15 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 10,396 | 10,410 | Perforated |
| 11,964 | 11,975 | Perforated |
| 11,978 | 11,990 | Perforated |
| 12,157 | 12,167 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 20 | 64 | — | — |
| 13.375 | 2,530 | 17.5 | 1,795 S |
| 9.625 | 9,334 | 12.25 | 641 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 19, 1991 | May 30, 1991 | Yes |
| 00 | Jul 15, 1991 | — | — |
| 00 | Jan 9, 1987 | Nov 14, 1986 | Yes |
| 00 | Dec 16, 1986 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-057-31415 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-057-31415 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/05731415, documented in the API reference.