TEXAS · WELLS · CALHOUN COUNTY · API 42-057-31420 · DISTRICT 02

Aluminum Co. of America (Fee) #14

Plugged

Calhoun County · Lavaca Bay (F-33) field  · Vertical

Aluminum CO. Of America (Fee) #14 (API 42-057-31420) is a plugged well in Calhoun County, plugged July 21, 2000, last operated by Neumin Production Company.

The RRC has issued 3 drilling permits (amended once) between 1986 and 1995, permitted to 14,000 ft.

Completion filings report 6 formation tops, including Frio, F-25, F-43, Tex-Miss.

Operator of record

Neumin Production Company

Based in
Point Comfort, TX
P-5 status
Delinquent (D)
P-5 last filed
Aug 9, 2023
Permits on file
380
Phone
(361) 987-7000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleNeumin Production Company
Production reportsNeumin Production Companythrough Oct 1997
Latest permitNeumin Production CompanyFeb 21, 1995
14,000
total depth, ft
4
permits on file
Feb 21, 1995
last permit issued
Feb 10, 1995
completed
0
cumulative oil, bbl
489K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2000

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 10, 1995
Shut in
—
Plugged
Jul 21, 2000

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Aluminum Co. of America (Fee) G-2-153464Lavaca Bay (F-33)Neumin Production Company10455KFeb 1995 – Jul 2000
Aluminum Co. of America Fee G-2-126086Lavaca Bay (F-40-A)Neumin Production Company1033.9KJan 1993 – Feb 1995

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Neumin Production CompanyJan 1993 → Oct 1997

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
433065-99RecompletionNeumin Production CompanyFeb 17, 1995Feb 21, 1995Feb 4, 199510,600
341214-99RecompletionNeumin Production CompanyJan 11, 1988Jan 13, 1988—12,552
323012-98DrillNeumin Production CompanyFeb 25, 1987Nov 14, 1986—12,552
323012-99DrillNeumin Production CompanyNov 12, 1986Nov 14, 1986—14,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Feb 10, 1995Aluminum Co. of America (Fee) G-2-153464Lavaca Bay (F-33)Neumin Production CompanyPlugged—
Dec 30, 1987Aluminum Co. of America Fee G-2-126086Lavaca Bay (F-40-A)Neumin Production CompanyPlugged—
Jan 27, 1987Aluminum Company of America Fee G-2-123398Lavaca Bay (F-48)Neumin Production CompanyPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 18 ft elevation.Download CSV →

FormationMD ftSubsea
Frio7,040-7,022
F-259,390-9,372
F-4310,815-10,797
Tex-Miss10,900-10,882
F-4811,756-11,738
Vicksburg12,490-12,472

Perforations

Perforated and open-hole intervals.

FromToType
9,7769,782Perforated
10,64510,652Perforated
11,75611,774Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
2078——
13.3752,51617.51,835 S
9.6259,32712.25655 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 9, 1995Mar 9, 1995Yes
00Apr 3, 1995——
00Feb 1, 1988Jan 12, 1988Yes
00Jan 30, 1988——
00Mar 27, 1987Feb 26, 1987Yes
00Mar 6, 1987——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/05731420, documented in the API reference.