TEXAS · WELLS · CALLAHAN COUNTY · G-8-122896 LEASE · API 42-059-00331 · DISTRICT 6E

Finley B #1-75

Plugged

Callahan County · Putnam West (Duffer) field  · Vertical

Finley B #1-75 (API 42-059-00331) is a plugged well in Callahan County, plugged November 21, 1989, last operated by Smith Pipe Of Abilene.

The RRC has issued one drilling permit, issued November 10, 1977, permitted to 4,000 ft.

It was permitted by Crown Exploration Company and has since transferred to Smith Pipe Of Abilene on the wellbore schedule.

Completion filings report 5 formation tops, including Jennings Sand, Caddo, Duffer, Barnett.

Operator of record

Smith Pipe of Abilene

Permitted by Crown Exploration Company; the EWA schedule now lists a different operator.

Based in
Abilene, TX
P-5 status
Inactive (I)
P-5 last filed
Aug 29, 2014
Phone
(325) 692-3903

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSmith Pipe of Abilene
Production reportsnone
Latest permitCrown Exploration CompanyNov 10, 1977

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,000
total depth, ft
1
permits on file
Nov 10, 1977
last permit issued
Apr 4, 1977
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Apr 4, 1977
Shut in
—
Plugged
Nov 21, 1989

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
— G-8-122896——000—

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
11804-99OtherCrown Exploration CompanyNov 10, 1977Nov 10, 1977—4,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Apr 4, 1977Finley B O-8-22986Putnam West (Jennings)Smith Pipe of AbilenePlugged—
Apr 4, 1977Finley -B- G-8-95504Putnam West (Jennings)Crown Exploration CompanyPlugged—
Apr 4, 1977Finley B G-8-122896Putnam West (Duffer)Smith Pipe of AbilenePlugged—
Apr 4, 1977Finley B O-8-22983Putnam West (Duffer)Crown Exploration CompanyPlugged—
Apr 4, 1977Finley-B- G-8-95503Putnam West (Duffer)Crown Exploration CompanyPlugged—
—Finley B O-8-13972Putnam West (Jennings)Crown Exploration CompanyPlugged—
—Finley B O-8-13952Putnam West (Duffer)Crown Exploration CompanyPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 1,585 ft elevation.Download CSV →

FormationMD ftSubsea
Jennings Sand2,698-1,113
Caddo3,412-1,827
Duffer3,910-2,325
Barnett3,984-2,399
Ellenburger4,127-2,542
Ellenburger4,227-2,642

Perforations

Perforated and open-hole intervals.

FromToType
2,7022,707Perforated
2,702—Perforated
3,9123,942Perforated
3,912—Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.625510.7575 S
8.62515110.7575 S
2.3754,006——
4.54,0777.875250 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jan 14, 1987Nov 19, 1986—
00Jan 13, 1987——
00Nov 21, 1985Sep 18, 1985—
00Oct 25, 1985Sep 18, 1985—
00Oct 18, 1985Sep 18, 1985—
00Oct 8, 1985——
00Jan 12, 1984Oct 6, 1981—
00Jan 12, 1984Nov 9, 1977—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/05900331, documented in the API reference.