TEXAS · WELLS · CALLAHAN COUNTY · API 42-059-02517 · DISTRICT 6E

McWilliams 207 #5

Plugged

Callahan County · Callahan County Regular field  · Vertical

Mcwilliams 207 #5 (API 42-059-02517) is a plugged well in Callahan County, plugged April 12, 2016, last operated by Quail Well Service Inc..

The RRC has issued one drilling permit, issued February 20, 2009, permitted to 1,907 ft.

It was permitted by Quail Well Service, Inc. and has since transferred to Quail Well Service Inc. on the wellbore schedule.

Operator of record

Quail Well Service Inc.

Permitted by Quail Well Service, Inc.; the EWA schedule now lists a different operator.

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitQuail Well Service, Inc.Feb 20, 2009

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,907
total depth, ft
1
permits on file
Feb 20, 2009
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Apr 12, 2016

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
678139-99ReenterQuail Well Service, Inc.Feb 2, 2009Feb 20, 2009Mar 15, 20091,907

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

10.8K
bbl, last 12 reported months
10.8K
bbl, all reported
Feb 2011
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000100864H-1 InjectionPlugged Apr 20, 20164005001,848–1,853

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 10,780 · prior 12 0

05001K20102011

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/05902517, documented in the API reference.