TEXAS · WELLS · CALLAHAN COUNTY · API 42-059-31321 · DISTRICT 6E

Finley 75 C #1C

Plugged

Callahan County · Putnam West (Duffer) field  · Vertical

Finley 75 C #1C (API 42-059-31321) is a plugged well in Callahan County, plugged November 17, 1989, last operated by Smith Pipe Of Abilene.

The RRC has issued one drilling permit, issued September 13, 1977, permitted to 4,150 ft.

It was permitted by Crown Exploration Company and has since transferred to Smith Pipe Of Abilene on the wellbore schedule.

Completion filings report 7 formation tops, including Palo Pinto, B/Palo Pinto, Capps Lime, Caddo.

Operator of record

Smith Pipe of Abilene

Permitted by Crown Exploration Company; the EWA schedule now lists a different operator.

Based in
Abilene, TX
P-5 status
Inactive (I)
P-5 last filed
Aug 29, 2014
Phone
(325) 692-3903

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSmith Pipe of Abilene
Production reportsnone
Latest permitCrown Exploration CompanySep 13, 1977

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,150
total depth, ft
1
permits on file
Sep 13, 1977
last permit issued
Mar 29, 1977
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 29, 1977
Shut in
—
Plugged
Nov 17, 1989

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
7455-99DrillCrown Exploration CompanySep 13, 1977Sep 13, 1977—4,150

Completions

CompletedLeaseFieldOperatorStatusDepth
Mar 29, 1977Finley 75 C G-8-122897Putnam West (Duffer)Smith Pipe of AbilenePlugged—
Mar 29, 1977Finley 75 O-8-22950Putnam West (Duffer)Crown Exploration CompanyPlugged—
Mar 29, 1977Finley 75 G-8-100719Putnam West (Duffer)Crown Exploration CompanyPlugged—
—Finley 75 O-8-13830Putnam West (Duffer)Crown Exploration CompanyPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 1,559 ft elevation.Download CSV →

FormationMD ftSubsea
Palo PintoBASE PALO PINTO2,201-642
B/Palo Pinto2,201-642
Capps Lime2,418-859
Caddo3,422-1,863
Duffer3,884-2,325
Barnett3,959-2,400
Ellenburger4,089-2,530

Perforations

Perforated and open-hole intervals.

FromToType
3,8853,915Perforated
3,885—Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62521511225 S
2.3753,904——
4.54,0227.87575 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jan 14, 1987Dec 19, 1986—
00Jan 13, 1987——
00Oct 18, 1985Sep 16, 1985—
00Oct 8, 1985——
00Jan 12, 1984Jul 21, 1982—
00Jan 12, 1984Sep 9, 1977—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/05931321, documented in the API reference.