TEXAS · WELLS · CALLAHAN COUNTY · API 42-059-31321 · DISTRICT 6E
Finley 75 C #1C
Callahan County · Putnam West (Duffer) field · Vertical
Finley 75 C #1C (API 42-059-31321) is a plugged well in Callahan County, plugged November 17, 1989, last operated by Smith Pipe Of Abilene.
The RRC has issued one drilling permit, issued September 13, 1977, permitted to 4,150 ft.
It was permitted by Crown Exploration Company and has since transferred to Smith Pipe Of Abilene on the wellbore schedule.
Completion filings report 7 formation tops, including Palo Pinto, B/Palo Pinto, Capps Lime, Caddo.
Operator of record
Permitted by Crown Exploration Company; the EWA schedule now lists a different operator.
- Based in
- Abilene, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Aug 29, 2014
- Phone
- (325) 692-3903
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Smith Pipe of Abilene |
| Production reports | none |
| Latest permit | Crown Exploration CompanySep 13, 1977 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,150
- total depth, ft
- 1
- permits on file
- Sep 13, 1977
- last permit issued
- Mar 29, 1977
- completed
- —
- cumulative oil, bbl
- —
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 29, 1977
- Shut in
- —
- Plugged
- Nov 17, 1989
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 7455-99 | Drill | Crown Exploration Company | Sep 13, 1977 | Sep 13, 1977 | — | 4,150 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Mar 29, 1977 | Finley 75 C G-8-122897 | Putnam West (Duffer) | Smith Pipe of Abilene | Plugged | — |
| Mar 29, 1977 | Finley 75 O-8-22950 | Putnam West (Duffer) | Crown Exploration Company | Plugged | — |
| Mar 29, 1977 | Finley 75 G-8-100719 | Putnam West (Duffer) | Crown Exploration Company | Plugged | — |
| — | Finley 75 O-8-13830 | Putnam West (Duffer) | Crown Exploration Company | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,559 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Palo PintoBASE PALO PINTO | 2,201 | -642 |
| B/Palo Pinto | 2,201 | -642 |
| Capps Lime | 2,418 | -859 |
| Caddo | 3,422 | -1,863 |
| Duffer | 3,884 | -2,325 |
| Barnett | 3,959 | -2,400 |
| Ellenburger | 4,089 | -2,530 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,885 | 3,915 | Perforated |
| 3,885 | — | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 215 | 11 | 225 S |
| 2.375 | 3,904 | — | — |
| 4.5 | 4,022 | 7.875 | 75 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 14, 1987 | Dec 19, 1986 | — |
| 00 | Jan 13, 1987 | — | — |
| 00 | Oct 18, 1985 | Sep 16, 1985 | — |
| 00 | Oct 8, 1985 | — | — |
| 00 | Jan 12, 1984 | Jul 21, 1982 | — |
| 00 | Jan 12, 1984 | Sep 9, 1977 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-059-31321 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-059-31321 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/05931321, documented in the API reference.