WELL · 42-059-31754 · DISTRICT 7

Finley D #1D-72

Plugged

Callahan County · Putnam West (Duffer) field  · Vertical

Finley D #1D-72 (API 42-059-31754) is a plugged well in Callahan County, plugged October 30, 1987, last operated by Crown Exploration Company.

The RRC has issued one drilling permit, issued June 27, 1977, permitted to 4,250 ft.

Completion filings report 6 formation tops, including Palo Pinto, Capps Lime, Caddo, Duffer.

Operator of record

Crown Exploration Company

Based in
Abilene, TX
P-5 status
Inactive (I)
P-5 last filed
Jan 26, 1995
Permits on file
135
Phone
(325) 692-7771

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleCrown Exploration Company
Production reportsnone
Latest permitCrown Exploration CompanyJun 27, 1977
4,250
total depth, ft
1
permits on file
Jun 27, 1977
last permit issued
Jul 17, 1977
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 17, 1977
Shut in
—
Plugged
Oct 30, 1987

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
1828-99DrillCrown Exploration CompanyJun 27, 1977Jun 27, 1977Jun 26, 19774,250

Formation tops

As filed on W-2/G-1. Subsea from 1,579 ft elevation.Download CSV →

FormationMD ftSubsea
Palo PintoBASE PALO PINTO2,239-660
Capps Lime2,450-871
Caddo3,458-1,879
Duffer3,935-2,356
Barnett4,004-2,425
Ellenburger4,141-2,562

Perforations

Perforated and open-hole intervals.

FromToType
3,9373,967Perforated
3,937—Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62522011125 S
2.3754,030——
4.54,0677.87580 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 18, 1985Sep 16, 1985—
00Sep 25, 1985——
00Jan 12, 1984Jul 21, 1982—
00Jan 12, 1984Sep 12, 1977—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/05931754, documented in the API reference.