WELL · 42-059-31932 · DISTRICT 7
Parsons Ina Mae #1
Callahan County · Parsons (Gray) field · Vertical
Parsons Ina Mae #1 (API 42-059-31932) is a plugged well in Callahan County, plugged November 20, 1997, last operated by Sun-Key Oil CO. Inc..
The RRC has issued one drilling permit, issued February 14, 1978, permitted to 4,115 ft.
It was permitted by Fisher-Webb, Inc. and has since transferred to Sun-Key Oil CO. Inc. on the wellbore schedule.
Completion filings report 3 formation tops, including Gray Sand, Caddo, Ellenburger.
Its lease has reported 4.24K barrels of oil and 47.4K mcf of gas since January 1993, last reporting in January 1998.
Operator of record
Permitted by Fisher-Webb, Inc.; the EWA schedule now lists a different operator.
- Based in
- Dublin, TX
- P-5 status
- Delinquent (D)
- P-5 last filed
- Apr 27, 2017
- Permits on file
- 10
- Phone
- (254) 445-3400
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Sun-Key Oil Co. Inc. |
| Production reports | Sun-Key Oil Co., Inc.through Feb 1997 |
| Latest permit | Fisher-Webb, Inc.Feb 14, 1978 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,115
- total depth, ft
- 1
- permits on file
- Feb 14, 1978
- last permit issued
- May 27, 1978
- completed
- 4.24K
- cumulative oil, bbl
- 47.4K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jan 1998
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- May 27, 1978
- Shut in
- —
- Plugged
- Nov 20, 1997
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Parsons, Ina Mae O-8-20523 | Parsons (Gray) | Sun-Key Oil Co., Inc. | 1 | 4.24K | 47.4K | Jan 1993 – Jan 1998 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Putnam Oil ProductionJan 1993 → Aug 1996
- 2Sun-Key Oil Co., Inc.Sep 1996 → Feb 1997
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 18200-99 | Drill | Fisher-Webb, Inc. | Feb 14, 1978 | Feb 14, 1978 | Apr 28, 1978 | 4,115 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-20523 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,808 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Gray Sand | 3,150 | -1,342 |
| Caddo | 3,252 | -1,444 |
| Ellenburger | 4,078 | -2,270 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,130 | 3,140 | Perforated |
| 3,130 | 3,158 | Perforated |
| 3,144 | 3,158 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 137 | 11.25 | 100 S |
| 2.375 | 3,110 | — | — |
| 4.5 | 3,275 | 7.875 | 100 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 24, 1984 | Oct 17, 1983 | — |
| 00 | Jan 12, 1984 | Jun 21, 1978 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-059-31932 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-059-31932 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/05931932, documented in the API reference.