TEXAS · WELLS · CALLAHAN COUNTY · API 42-059-32628 · DISTRICT 6E
Simmons Samuel #3T
Callahan County · Putnam NE (Miss) field · Vertical
Simmons Samuel #3T (API 42-059-32628) is a plugged well in Callahan County, plugged May 4, 2010, last operated by Van Operating Ltd..
The RRC has issued one drilling permit, issued March 28, 1980, permitted to 4,059 ft.
It was permitted by Jones CO. and has since transferred to Van Operating Ltd. on the wellbore schedule.
Its 2 leases have reported 76.3K mcf of gas since January 1993, with no volume in the three years through April 2026. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Jones Co.; the EWA schedule now lists a different operator.
- Based in
- Albany, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Jan 28, 2021
- Permits on file
- 96
- Phone
- (325) 762-3353
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Van Operating Ltd. |
| Production reports | Van Operating, Ltd.through Apr 2000 |
| Latest permit | Jones Co.Mar 28, 1980 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,059
- total depth, ft
- 1
- permits on file
- Mar 28, 1980
- last permit issued
- Jul 24, 1980
- completed
- 0
- cumulative oil, bbl
- 76.3K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 2000
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jul 24, 1980
- Shut in
- —
- Plugged
- May 4, 2010
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Simmons, Samuel G-8-90007 | Putnam NE (1ST Conglomerate) | Van Operating, Ltd. | 1 | 0 | 42.6K | Jan 1993 – Apr 2000 |
| Simmons, Samuel G-8-89376 | Putnam, NE (Miss) | Van Operating, Ltd. | 1 | 0 | 33.7K | Jan 1993 – Jan 1998 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Jones Company, Ltd.Jan 1993 → Jul 1995
- 2Van Operating, Ltd.Aug 1995 → Apr 2000
Permits
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Jul 24, 1980 | Simmons Samuel G-8-89376 | Putnam NE (Miss) | Van Operating Ltd. | Plugged | — |
| Jun 11, 1980 | Simmons Samuel G-8-90007 | Putnam NE (1ST Conglomerate) | Van Operating Ltd. | Plugged | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,603 | 3,637 | Perforated |
| 3,951 | 3,964 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 124 | 11 | 110 S |
| 8.625 | 125 | 11 | 110 S |
| 2.375 | 3,531 | — | — |
| 2.375 | 3,910 | — | — |
| 4.5 | 4,026 | 7.875 | 150 S |
| 4.5 | 4,027 | 7.875 | 150 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 1984 | Aug 21, 1980 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-059-32628 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-059-32628 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/05932628, documented in the API reference.