TEXAS · WELLS · CALLAHAN COUNTY · API 42-059-32876 · DISTRICT 6E

Finley G #1

Plugged

Callahan County · Putnam West (Duffer) field  · Vertical

Finley G #1 (API 42-059-32876) is a plugged well in Callahan County, plugged November 27, 1989, last operated by Smith Pipe Of Abilene.

The RRC has issued one drilling permit, issued November 7, 1980, permitted to 4,250 ft.

It was permitted by Crown Exploration Company and has since transferred to Smith Pipe Of Abilene on the wellbore schedule.

Operator of record

Smith Pipe of Abilene

Permitted by Crown Exploration Company; the EWA schedule now lists a different operator.

Based in
Abilene, TX
P-5 status
Inactive (I)
P-5 last filed
Aug 29, 2014
Phone
(325) 692-3903

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSmith Pipe of Abilene
Production reportsnone
Latest permitCrown Exploration CompanyNov 7, 1980

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,250
total depth, ft
1
permits on file
Nov 7, 1980
last permit issued
May 14, 1981
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
May 14, 1981
Shut in
—
Plugged
Nov 27, 1989

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
98379-99DrillCrown Exploration CompanyNov 7, 1980Nov 7, 1980Oct 30, 19804,250

Completions

CompletedLeaseFieldOperatorStatusDepth
May 14, 1981Finley G G-8-122971Putnam West (Duffer)Smith Pipe of AbilenePlugged—
May 14, 1981Finley G O-8-17234Putnam West (Duffer)Crown Exploration CompanyPlugged—

Perforations

Perforated and open-hole intervals.

FromToType
3,9193,957Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62521011100 S
2.3754,043——
4.54,1747.875275 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 16, 1987Dec 29, 1986—
00Jan 13, 1987——
00Jan 12, 1984Jun 10, 1981—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/05932876, documented in the API reference.