TEXAS · WELLS · CALLAHAN COUNTY · API 42-059-32889 · DISTRICT 6E
Webb #1
Callahan County · Myers (Hope Upper) field · Vertical
Webb #1 (API 42-059-32889) is a plugged well in Callahan County, plugged March 4, 1986, last operated by Dekah Companies.
The RRC has issued one drilling permit, issued November 12, 1980, permitted to 2,000 ft.
Operator of record
- Based in
- Baird, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Apr 3, 1986
- Permits on file
- 7
- Phone
- (325) 854-1182
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Dekah Companies |
| Production reports | none |
| Latest permit | Dekah CompaniesNov 12, 1980 |
- 2,000
- total depth, ft
- 1
- permits on file
- Nov 12, 1980
- last permit issued
- Mar 25, 1981
- completed
- —
- cumulative oil, bbl
- —
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 25, 1981
- Shut in
- —
- Plugged
- Mar 4, 1986
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Wells nearby
Every well with a location on file around this well, in any state, nearest first.
Texas locations come from drilling permits, so most older Texas wells have none and are not listed.
Wells named Webb
Dekah Companies's other wells filed under this lease name in Callahan County, newest permit first. The RRC gives a gas well its own lease number, so the name is what joins the wells of a unit.
Loading the lease's wellsChain of custody
Operator on the lease's P-4
Each operator named on the P-4 filings for this well's lease (a gas well is its own lease), from the date its filing took effect. The P-4 is filed by lease, so a date before the well was drilled is the lease's.
| Operator | From | To |
|---|---|---|
| Dekah Companies | Mar 25, 1981 | today |
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 98711-99 | Drill | Dekah Companies | Nov 12, 1980 | Nov 12, 1980 | — | 2,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Mar 25, 1981 | Webb O-8-17119 | Myers (Hope Upper) | Dekah Companies | Plugged | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,522 | 1,526 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 110 | 10 | 75 S |
| 2.375 | 1,526 | — | — |
| 4.5 | 1,608 | 7.875 | 120 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 1984 | May 14, 1981 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-059-32889 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-059-32889 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/05932889, documented in the API reference.