TEXAS · WELLS · CALLAHAN COUNTY · API 42-059-33436 · DISTRICT 6E

Dyer 2988 #3

Plugged

Callahan County · Callahan NE (Congl) field  · Vertical

Dyer 2988 #3 (API 42-059-33436) is a plugged well in Callahan County, plugged September 22, 2020, last operated by Van Operating Ltd..

The RRC has issued one drilling permit, issued November 30, 1981, permitted to 4,200 ft.

It was permitted by Jones CO. and has since transferred to Van Operating Ltd. on the wellbore schedule.

Completion filings report 5 formation tops, including T/Gardner, T/Caddo, B/Caddo, T/Bond Sand.

Its 2 leases have reported 11.9K barrels of oil and 353K mcf of gas since January 1993, with no volume in the three years through April 2026. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Van Operating Ltd.

Permitted by Jones Co.; the EWA schedule now lists a different operator.

Based in
Albany, TX
P-5 status
Inactive (I)
P-5 last filed
Jan 28, 2021
Permits on file
96
Phone
(325) 762-3353

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleVan Operating Ltd.
Production reportsVan Operating, Ltd.through Mar 2012
Latest permitJones Co.Nov 30, 1981

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,200
total depth, ft
1
permits on file
Nov 30, 1981
last permit issued
Sep 9, 1998
completed
11.9K
cumulative oil, bbl
353K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Mar 2012

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Sep 9, 1998
Shut in
—
Plugged
Sep 22, 2020

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Dyer "2988" G-8-171327Callahan, NE (Congl)Van Operating, Ltd.14.27K221KDec 1998 – Mar 2012
Dyer "2988" O-8-21128Callahan, NE (Congl)Van Operating, Ltd.17.64K132KJan 1993 – Dec 1998

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Jones Company, Ltd.Jan 1993 → Jul 1995
  2. 2Van Operating, Ltd.Aug 1995 → Mar 2012

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
141930-99DrillJones Co.Nov 30, 1981Nov 30, 1981Nov 15, 19814,200

Completions

CompletedLeaseFieldOperatorStatusDepth
Sep 9, 1998Dyer 2988 G-8-171327Callahan NE (Congl)Van Operating Ltd.Plugged—
May 7, 1984Dyer 2988 O-8-21128Callahan NE (Congl)Van Operating Ltd.Plugged—

Formation tops

As filed on W-2/G-1. Subsea from 1,472 ft elevation.Download CSV →

FormationMD ftSubsea
T/Gardner2,320-848
T/Caddo3,228-1,756
B/Caddo3,567-2,095
T/Bond Sand3,693-2,221
T/Duffer3,892-2,420

Perforations

Perforated and open-hole intervals.

FromToType
3,8963,908Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62510212.2590 S
4.54,0687.875250 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jan 25, 1999Dec 28, 1998—
00Jan 14, 1999——
00Jun 8, 1984May 22, 1984—
00Jun 2, 1984May 22, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/05933436, documented in the API reference.