TEXAS · WELLS · CALLAHAN COUNTY · HOOKS "91" LEASE · API 42-059-34204 · DISTRICT 6E

Hooks 91 #43

Shut in

Callahan County · Callahan County Regular field · Shut In  · Vertical

Hooks 91 #43 (API 42-059-34204) is a well in Callahan County operated by Grayrock Energy II LLC, completed October 10, 2008 and listed as shut in on the RRC schedule, shut in November 1, 2020.

The RRC has issued 2 drilling permits (amended once) between 1983 and 2008, permitted to 3,952 ft.

It was permitted by L.C.S. Production Company and has since transferred to Grayrock Energy II LLC on the wellbore schedule.

Completion filings report one formation top, including Morris Sand.

Its lease has reported 741 barrels of oil and 16.6K mcf of gas since October 2008, last reporting in July 2026.

Operator of record

Grayrock Energy II LLC

Permitted by L.C.S. Production Company; the EWA schedule now lists a different operator.

Based in
Fort Worth, TX
P-5 status
Active (A)
P-5 last filed
Oct 16, 2025
Phone
(214) 234-9115

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleGrayrock Energy II LLC
Production reportsRover Petroleum Operating, LLCthrough Apr 2020
Latest permitL.C.S. Production CompanyJul 11, 2008

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,952
total depth, ft
3
permits on file
Jul 11, 2008
last permit issued
Oct 10, 2008
completed
741
cumulative oil, bbl
16.6K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Oct 2008 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Oct 10, 2008
Shut in
Nov 1, 2020
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Hooks "91" O-8-30221Callahan County RegularGrayrock Energy II, LLC174116.6KOct 2008 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1L.C.S. Production CompanyNov 2008 → Apr 2009
  2. 2Plantation Operating, LLCJan 2010 → Nov 2011
  3. 3Merit Energy CompanyDec 2011 → May 2017
  4. 4Rover Petroleum Operating, LLCJul 2017 → Apr 2020

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
665000-98ReenterL.C.S. Production CompanyAug 7, 2008Jul 11, 2008Sep 3, 20084,999
665000-99ReenterL.C.S. Production CompanyJun 20, 2008Jul 11, 2008—3,227
195779-99DrillNueve Operating Co. of TexasMay 13, 1983May 13, 1983May 13, 19833,300

Completions

CompletedLeaseFieldOperatorStatusDepth
Oct 10, 2008Hooks 91 O-8-30221Callahan County RegularGrayrock Energy II LLCShut In · shut in Nov 1, 20203,952

Formation tops

As filed on W-2/G-1. Subsea from 1,870 ft elevation.Download CSV →

FormationMD ftSubsea
Morris Sand3,368-1,498

Perforations

Perforated and open-hole intervals.

FromToType
3,3733,379Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62512012.25115 S
4.53,5477.875600 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 19, 2009Dec 3, 2008Yes
00Jan 8, 2009——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/05934204, documented in the API reference.