WELL · 42-059-34462 · DISTRICT 7
Price #1
Callahan County · Jimax (3710 Congl.) field · Vertical
Price #1 (API 42-059-34462) is a plugged well in Callahan County, plugged November 10, 2009, last operated by Maverick Prod. CO. Inc..
The RRC has issued one drilling permit, issued September 8, 1983, permitted to 4,200 ft.
Completion filings report 3 formation tops, including Caddo, Duffer, Ellenburger.
Operator of record
- Based in
- Houston, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Jun 13, 2016
- Permits on file
- 617
- Phone
- (832) 783-5700
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Maverick Prod. Co. Inc. |
| Production reports | none |
| Latest permit | Maverick Prod. Co. Inc.Sep 8, 1983 |
- 4,200
- total depth, ft
- 1
- permits on file
- Sep 8, 1983
- last permit issued
- Mar 23, 1984
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Nov 2009
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 23, 1984
- Shut in
- —
- Plugged
- Nov 10, 2009
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Price G-8-111477 | Jimax (3710 Congl.) | Maverick Prod. Co., Inc. | 1 | 0 | 0 | Jan 1993 – Nov 2009 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 210747-99 | Drill | Maverick Prod. Co. Inc. | Aug 29, 1983 | Sep 8, 1983 | — | 4,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-8-111477 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,410 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Caddo | 3,352 | -1,942 |
| Duffer | 3,890 | -2,480 |
| Ellenburger | 4,108 | -2,698 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,711 | 3,719 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 113 | 12.25 | 96 sx |
| 4.5 | 4,153 | 7.875 | 280 sx |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 27, 1984 | May 21, 1984 | — |
| 00 | Jul 26, 1984 | May 21, 1984 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-059-34462 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-059-34462 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/05934462, documented in the API reference.