WELL · 42-059-35290 · DISTRICT 7

Davis Estate A #2

Plugged

Callahan County · Callahan County Regular (Gas) field  · Vertical

Davis Estate A #2 (API 42-059-35290) is a plugged well in Callahan County, plugged January 23, 2023, last operated by At&L Oil CO..

The RRC has issued 2 drilling permits between 1985 and 1986, permitted to 3,999 ft.

Completion filings report 8 formation tops, including Dothan, Dothan Lm, Tannehill, Saddle Ck..

Its lease has reported 12.5K barrels of oil and 34K mcf of gas since January 1993, last reporting in July 2026.

Operator of record

At&l Oil Co.

Based in
Abilene, TX
P-5 status
Inactive (I)
P-5 last filed
Jan 16, 1987
Permits on file
3
Phone
(325) 673-7444

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleAt&l Oil Co.
Production reportsDJ & T Services, LLCthrough Jun 2019
Latest permitAt&l Oil Co.May 12, 1986

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,999
total depth, ft
2
permits on file
May 12, 1986
last permit issued
May 6, 1985
completed
12.5K
cumulative oil, bbl
34K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
May 6, 1985
Shut in
—
Plugged
Jan 23, 2023

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Davis Estate "A" O-8-23755A.t.& H. (Palo Pinto Sd.)DJ & T Services, LLC112.5K34KJan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Sheets Exploration Co., Inc.Jan 1993 → Sep 1994
  2. 2Tracker MineralOct 1994 → Jun 1996
  3. 3Continual Oil & Gas, Inc.Jul 1996 → Feb 1998
  4. 4BC Operating, Inc.Mar 1998 → Oct 2004
  5. 5Crownquest Operating, LLCJan 2000 → Jul 2001
  6. 6Celero Energy, L.P.Nov 2004 → Sep 2005
  7. 7Whiting Oil and Gas CorporationOct 2005 → May 2006
  8. 8L.C.S. Production CompanyJun 2006 → Jul 2008
  9. 9Couch Oil & Gas, Inc.May 2010 → Jan 2015
  10. 10Global Drilling, LLCJul 2016 → Oct 2018
  11. 11DJ & T Services, LLCDec 2018 → Jun 2019

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
301994-99RecompletionAt&l Oil Co.Apr 17, 1986May 12, 1986—3,425
270390-99DrillAt&l Oil Co.Mar 22, 1985Mar 25, 1985—3,999

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-23755————

Formation tops

As filed on W-2/G-1. Subsea from 1,903 ft elevation.Download CSV →

FormationMD ftSubsea
Dothan1,278625
Dothan LM1,278625
TannehillTANNEHILL, UP.1,512391
Saddle Ck.1,640263
Saddle Creek1,640263
Cook Sd.1,760143
Palo Pinto3,150-1,247
Gardner3,926-2,023

Perforations

Perforated and open-hole intervals.

FromToType
3,1633,167Perforated
3,9263,928Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62510312.2570 S
4.53,9987.875280 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 24, 1986Dec 9, 1985Yes
00Jun 13, 1986——
00Jun 19, 1985Jun 4, 1985—
00Jun 16, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/05935290, documented in the API reference.