TEXAS · WELLS · CALLAHAN COUNTY · PARKER LEASE · API 42-059-36247 · DISTRICT 6E

Parker #1

Plugged

Callahan County · Callahan County Regular (Gas) field  · Vertical

Parker #1 (API 42-059-36247) is a plugged well in Callahan County, plugged March 26, 2001, last operated by Dudley Drilling Inc..

The RRC has issued one drilling permit (amended once), issued August 7, 1992, permitted to 1,999 ft.

Completion filings report one formation top, including Cook Sand.

Operator of record

Dudley Drilling Inc.

Based in
Abilene, TX
P-5 status
Inactive (I)
P-5 last filed
Mar 8, 2000
Permits on file
6
Phone
(325) 529-3511

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleDudley Drilling Inc.
Production reportsnone
Latest permitDudley Drilling, Inc.Aug 7, 1992
1,999
total depth, ft
2
permits on file
Aug 7, 1992
last permit issued
Jan 1, 1993
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH —

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 1, 1993
Shut in
—
Plugged
Mar 26, 2001

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Parker G-8-143646Callahan County Regular (Gas)Dudley Drilling, Inc.100Jan 1993 – —

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
401926-98DrillDudley Drilling, Inc.Jan 15, 1993Aug 7, 1992Aug 8, 19921,999
401926-99DrillDudley Drilling, Inc.Aug 3, 1992Aug 7, 1992—1,999

Completions

CompletedLeaseFieldOperatorStatusDepth
Jan 1, 1993Parker G-8-143646Callahan County Regular (Gas)Dudley Drilling Inc.Plugged—

Formation tops

As filed on W-2/G-1. Subsea from 2,050 ft elevation.Download CSV →

FormationMD ftSubsea
Cook Sand1,902148

Perforations

Perforated and open-hole intervals.

FromToType
1,9031,907Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251051150 S
4.51,9987.875100 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Mar 12, 1993Jan 13, 1993Yes
00Jan 29, 1993——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/05936247, documented in the API reference.