WELL · 42-065-01457 · DISTRICT 10

Burnett #35

Y

Carson County · Panhandle West field · Producing  · Horizontal

Burnett #35 (API 42-065-01457) is a horizontal well in Carson County operated by High River Res Operating LLC, completed March 18, 2013 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued December 17, 2012, permitted to 2,750 ft.

It was permitted by Parallel Energy LP and has since transferred to High River Res Operating LLC on the wellbore schedule.

Completion filings report 4 formation tops, including Panhandle Lime, Brown Dolomite, Moore County Lime, Granite Wash.

No lease production has been reported under this well’s leases.

Operator of record

High River Res Operating LLC

Permitted by Parallel Energy LP; the EWA schedule now lists a different operator.

Dallas, TX · P-5 Y, filed Jul 4, 2026 · 6 permits on file · (713) 824-5449

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHigh River Res Operating LLC
Production reportsHigh River Res Operating, LLCthrough Apr 2026
Latest permitParallel Energy LPDec 17, 2012

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

2,750
total depth, ft
1
permits on file
Dec 17, 2012
last permit issued
Mar 18, 2013
completed
0
cumulative oil, bbl
2.49M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Mar 18, 2013
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Burnett G-14-23121Panhandle, WestHigh River Res Operating, LLC102.49MJan 1993 – Jul 2026

Gas, mcf lease total

Last 12 months 39,399 · prior 12 40,568(-3%)

02K4K6K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Conoco Inc.Jan 1993 → Dec 2002
  2. 2Conocophillips CompanyJan 2003 → Nov 2010
  3. 3Bravo Natural Gas, LLCDec 2010 → Jun 2012
  4. 4Parallel Energy LPJul 2012 → Dec 2015
  5. 5Scout Energy Management LLCJan 2016 → Dec 2024
  6. 6High River Res Operating, LLCJan 2025 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
753104-99RecompletionParallel Energy LPDec 12, 2012Dec 17, 2012Feb 18, 20132,750

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-14-23121————

Formation tops

As filed on W-2/G-1. Subsea from 3,236 ft elevation.Download CSV →

FormationMD ftSubsea
Panhandle LimePANHANDLE, LIME1,8701,366
Brown Dolomite2,263973
Brown Dolomite2,275961
Moore County Lime2,425811
Granite Wash2,535701

Perforations

Perforated and open-hole intervals.

FromToType
1,8705,000Open hole
2,2632,601Perforated
2,2632,601Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13349—275 S
9.62535013260 S
7.52,2598300 S
8.6252,263—300 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 26, 2014Oct 24, 2013Yes
00Jan 2, 1996Aug 16, 1995—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/06501457, documented in the API reference.