WELL · 42-065-31637 · DISTRICT 10
Bart #1
Carson County · Panhandle Carson County Field field · Vertical
Bart #1 (API 42-065-31637) is a plugged well in Carson County, plugged August 28, 2015, last operated by Scout Energy Management LLC.
The RRC has issued one drilling permit, issued December 1, 1983, permitted to 3,600 ft.
It was permitted by Caprock Engineers, Inc. and has since transferred to Scout Energy Management LLC on the wellbore schedule.
Completion filings report 2 formation tops, including Brown Dolomite, Weathered Granite.
Its lease has reported 625 barrels of oil and 88.8K mcf of gas since January 1993, last reporting in September 2018. The lease carries 4 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Caprock Engineers, Inc.; the EWA schedule now lists a different operator.
Dallas, TX · P-5 Y, filed Aug 4, 2025 · 483 permits on file · (888) 493-2118
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Scout Energy Management LLC |
| Production reports | Caprock Engineering, Inc.through Feb 2013 |
| Latest permit | Caprock Engineers, Inc.Dec 1, 1983 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,600
- total depth, ft
- 1
- permits on file
- Dec 1, 1983
- last permit issued
- May 2, 1984
- completed
- 625
- cumulative oil, bbl
- 88.8K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Sep 2018
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- May 2, 1984
- Shut in
- —
- Plugged
- Aug 28, 2015
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 4 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Bart O-14-5708 | Panhandle Carson County Field | Scout Energy Management LLC | 4 | 625 | 88.8K | Jan 1993 – Sep 2018 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Caprock Engineering, Inc.Jan 1993 → Sep 1999
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 222183-99 | Drill | Caprock Engineers, Inc. | Dec 5, 1983 | Dec 1, 1983 | Jan 16, 1984 | 3,600 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-14-5708 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 3,315 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Brown Dolomite | 2,740 | 575 |
| Weathered Granite | 2,980 | 335 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,960 | 3,064 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 721 | 12.25 | 275 sx |
| 5.5 | 3,079 | 7.875 | 200 sx |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 26, 1985 | May 11, 1984 | — |
| 00 | Nov 23, 1985 | — | — |
| 00 | May 29, 1984 | May 11, 1984 | — |
| 00 | May 22, 1984 | May 11, 1984 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-065-31637 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-065-31637 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/06531637, documented in the API reference.