WELL · 42-065-31701 · DISTRICT 10

Schafer Ranch #287

Plugged

Carson County · Panhandle Carson County Field field  · Vertical

Schafer Ranch #287 (API 42-065-31701) is a plugged well in Carson County, plugged April 7, 2011, last operated by Large Operating LLC.

The RRC has issued one drilling permit, issued April 27, 1984, permitted to 3,600 ft.

It was permitted by Getty Oil CO. and has since transferred to Large Operating LLC on the wellbore schedule.

Completion filings report 2 formation tops, including Brown Dolomite, Granite Wash.

Its lease has reported 317K barrels of oil and 506K mcf of gas since January 1993, last reporting in July 2026. The lease carries 205 wells, so these are lease totals, not this well alone.

Operator of record

Large Operating LLC

Permitted by Getty Oil Co.; the EWA schedule now lists a different operator.

Based in
Stinnett, TX
P-5 status
Active (A)
P-5 last filed
Oct 17, 2025
Permits on file
2
Phone
(212) 798-1320

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleLarge Operating LLC
Production reportsM5OEXIT, LLCthrough Mar 2023
Latest permitGetty Oil Co.Apr 27, 1984

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,600
total depth, ft
1
permits on file
Apr 27, 1984
last permit issued
Jul 24, 1984
completed
317K
cumulative oil, bbl
506K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 24, 1984
Shut in
—
Plugged
Apr 7, 2011

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 205 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Schafer Ranch East O-14-6568Panhandle Carson County FieldM5OEXIT, LLC205317K506KJan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Caldwell Production Co. Inc.Jan 1993 → Mar 2007
  2. 2Gryphon Production Company, LLCApr 2007 → Aug 2008
  3. 3Legacy Reserves Operating LPSep 2008 → Apr 2015
  4. 4Mac 5 Operating, LLCMay 2015 → Feb 2021
  5. 5M5OEXIT, LLCMar 2021 → Mar 2023

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
238291-99DrillGetty Oil Co.Apr 4, 1984Apr 27, 1984Jun 26, 19843,600

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-14-6568————

Formation tops

As filed on W-2/G-1. Subsea from 3,147 ft elevation.Download CSV →

FormationMD ftSubsea
Brown Dolomite2,948199
Granite Wash3,372-225

Perforations

Perforated and open-hole intervals.

FromToType
3,0383,044Perforated
3,0563,058Perforated
3,0623,064Perforated
3,0673,080Perforated
3,0833,094Perforated
3,0973,102Perforated
3,1103,116Perforated
3,1223,126Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62555412.25267 sx
5.53,5907.875200 sx

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 3, 1988Aug 8, 1984—
00Sep 27, 1988——
00Aug 16, 1984Aug 8, 1984—
00Aug 15, 1984Aug 8, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/06531701, documented in the API reference.