WELL · 42-065-31993 · DISTRICT 10

Burnett #A 5R

Y

Carson County · Panhandle West field · Producing  · Horizontal

Burnett #A 5R (API 42-065-31993) is a horizontal well in Carson County operated by High River Res Operating LLC, completed April 19, 2011 and listed as producing on the RRC schedule.

The RRC has issued 2 drilling permits between 1996 and 2011, permitted to 4,000 ft.

It was permitted by Bravo Natural Gas, LLC and has since transferred to High River Res Operating LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Panhandle Lime, Brown Dolomite, Granite Wash.

No lease production has been reported under this well’s leases.

Operator of record

High River Res Operating LLC

Permitted by Bravo Natural Gas, LLC; the EWA schedule now lists a different operator.

Dallas, TX · P-5 Y, filed Jul 4, 2026 · 6 permits on file · (713) 824-5449

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHigh River Res Operating LLC
Production reportsHigh River Res Operating, LLCthrough Apr 2026
Latest permitBravo Natural Gas, LLCMar 25, 2011

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,000
total depth, ft
2
permits on file
Mar 25, 2011
last permit issued
Apr 19, 2011
completed
0
cumulative oil, bbl
1.35M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jul 1996 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Apr 19, 2011
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Burnett G-14-159591Panhandle, WestHigh River Res Operating, LLC101.35MJul 1996 – Jul 2026

Gas, mcf lease total

Last 12 months 9,717 · prior 12 10,419(-7%)

01K2K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Conoco Inc.Aug 1996 → Dec 2002
  2. 2Conocophillips CompanyJan 2003 → Nov 2010
  3. 3Bravo Natural Gas, LLCDec 2010 → Jun 2012
  4. 4Parallel Energy LPJul 2012 → Dec 2015
  5. 5Scout Energy Management LLCJan 2016 → Dec 2024
  6. 6High River Res Operating, LLCJan 2025 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
712434-99RecompletionBravo Natural Gas, LLCMar 21, 2011Mar 25, 2011Mar 26, 20112,700
450027-99DrillConoco Inc.Jul 3, 1996Jul 9, 1996Jul 9, 19964,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-14-159591————

Formation tops

As filed on W-2/G-1. Subsea from 3,195 ft elevation.Download CSV →

FormationMD ftSubsea
Panhandle Lime1,9851,210
Brown Dolomite2,1761,019
Granite Wash2,433762

Perforations

Perforated and open-hole intervals.

FromToType
1,9854,803Open hole
1,9855,000Open hole
2,1762,477Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62546212.25200 S
72,1777140 S
72,1778.75140 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 29, 2014Jan 10, 2013—
00Aug 9, 2012Jul 25, 2011Yes
00Sep 23, 1996Aug 19, 1996Yes
00Sep 3, 1996——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/06531993, documented in the API reference.