WELL · 42-065-32011 · DISTRICT 10

Burnett F Unit #A 75RH

Y

Carson County · Panhandle West field · Producing  · Horizontal

Burnett F Unit #A 75RH (API 42-065-32011) is a horizontal well in Carson County operated by High River Res Operating LLC, completed December 30, 1999 and listed as producing on the RRC schedule.

The RRC has issued 2 drilling permits (amended once) between 1997 and 1999, permitted to 3,888 ft.

It was permitted by Conoco Inc. and has since transferred to High River Res Operating LLC on the wellbore schedule.

Completion filings report 4 formation tops, including Panhandle Lime, Brown Dolomite, Granite Wash, Granite.

No lease production has been reported under this well’s leases.

Operator of record

High River Res Operating LLC

Permitted by Conoco Inc.; the EWA schedule now lists a different operator.

Dallas, TX · P-5 Y, filed Jul 4, 2026 · 6 permits on file · (713) 824-5449

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHigh River Res Operating LLC
Production reportsHigh River Res Operating, LLCthrough Apr 2026
Latest permitConoco Inc.Nov 12, 1999

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,888
total depth, ft
3
permits on file
Nov 12, 1999
last permit issued
Dec 30, 1999
completed
0
cumulative oil, bbl
2.01M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Dec 1997 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 30, 1999
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Burnett F Unit G-14-169451Panhandle, WestHigh River Res Operating, LLC102.01MDec 1997 – Jul 2026

Gas, mcf lease total

Last 12 months 25,473 · prior 12 26,577(-4%)

02K4K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Conoco Inc.Mar 1998 → Dec 2002
  2. 2Conocophillips CompanyJan 2003 → Nov 2010
  3. 3Bravo Natural Gas, LLCDec 2010 → Jun 2012
  4. 4Parallel Energy LPJul 2012 → Dec 2015
  5. 5Scout Energy Management LLCJan 2016 → Dec 2024
  6. 6High River Res Operating, LLCJan 2025 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
489483-99RecompletionConoco Inc.Nov 12, 1999Nov 12, 1999Dec 13, 19993,888
462383-98DrillConoco Inc.Dec 4, 1997May 22, 1997Dec 12, 19973,500
462383-99DrillConoco Inc.May 13, 1997May 22, 1997—3,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-14-169451————

Formation tops

As filed on W-2/G-1. Subsea from 3,269 ft elevation.Download CSV →

FormationMD ftSubsea
Panhandle Lime1,8581,411
Panhandle LimePANHANDLE, LIME1,8581,411
Brown Dolomite2,2631,006
Granite Wash2,664605
Granite2,770499

Perforations

Perforated and open-hole intervals.

FromToType
1,9273,925Open hole
2,2352,775Perforated
2,2352,775Open hole
2,2562,975Perforated
2,4003,295Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62546812.25200 S
72,2508.75140 S
9.625———
7———

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 22, 2014Apr 14, 2014—
00May 1, 2000Feb 11, 2000—
00Sep 2, 1998Mar 25, 1998Yes
00Aug 28, 1998——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/06532011, documented in the API reference.