TEXAS · WELLS · CASS COUNTY · API 42-067-30744 · DISTRICT 06
Conner #2
Cass County · Lake Ferrell (Pettit Upper) field · Shut In · Vertical
Conner #2 (API 42-067-30744) is a well in Cass County operated by Buffco Production Inc., completed January 28, 2017 and listed as shut in on the RRC schedule, shut in April 1, 2018.
The RRC has issued 4 drilling permits between 2003 and 2017, permitted to 11,842 ft.
Completion filings report 8 formation tops, including Buda, Massive, Rodessa, Travis Peak.
Its 3 leases have reported 639 barrels of oil and 325K mcf of gas since July 2004, last reporting in July 2026. The leases carry 3 wells, so these are lease totals, not this well alone.
Operator of record
- Based in
- Longview, TX
- P-5 status
- Active (A)
- P-5 last filed
- Nov 14, 2025
- Permits on file
- 397
- Phone
- (903) 988-8199
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Buffco Production Inc.through May 2017 |
| Latest permit | Buffco Production Inc.Mar 16, 2017 |
- 11,842
- total depth, ft
- 4
- permits on file
- Mar 16, 2017
- last permit issued
- Jan 28, 2017
- completed
- 639
- cumulative oil, bbl
- 325K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jul 2004 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Jan 28, 2017
- Shut in
- Apr 1, 2018
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Conner O-6-15535 | Lake Ferrell (Pettit, Upper) | Buffco Production Inc. | 1 | 639 | 262 | Jan 2017 – Jul 2026 |
| Conner G-6-280163 | Lassater (Cotton Valley) | Buffco Production Inc. | 1 | 0 | 4.97K | Sep 2015 – Jan 2017 |
| Conner G-6-204920 | Avinger (Jurassic) | Buffco Production Inc. | 1 | 0 | 319K | Jul 2004 – Sep 2015 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Brown, Tom Inc.Dec 2004 → Dec 2004
- 2Encana Oil & Gas(usa) Inc.Jan 2005 → Sep 2010
- 3Buffco Production Inc.Apr 2011 → May 2017
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 824242-99 | Recompletion | Buffco Production Inc. | Mar 8, 2017 | Mar 16, 2017 | — | 8,000 |
| 814520-99 | Recompletion | Buffco Production Inc. | Mar 22, 2016 | Mar 28, 2016 | Aug 14, 2015 | 10,650 |
| 811034-99 | Recompletion | Buffco Production Inc. | Oct 8, 2015 | Oct 14, 2015 | — | 10,700 |
| 538624-99 | Drill | Brown, Tom Inc. | Nov 14, 2003 | Nov 18, 2003 | Feb 1, 2004 | 13,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Jan 28, 2017 | Conner O-6-15535 | Lake Ferrell (Pettit Upper) | Buffco Production Inc. | Shut In · shut in Apr 1, 2018 | 11,842 |
| Sep 12, 2015 | Conner G-6-280163 | Lassater (Cotton Valley) | Buffco Production Inc. | Not on Schedule | — |
| Jul 28, 2004 | Conner G-6-204920 | Avinger (Jurassic) | Buffco Production Inc. | Not on Schedule | — |
Formation tops
As filed on W-2/G-1. Subsea from 413 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Buda | 4,118 | -3,705 |
| Massive | 6,669 | -6,256 |
| Rodessa | 6,903 | -6,490 |
| Travis Peak | 7,761 | -7,348 |
| Cotton Valley | 9,630 | -9,217 |
| Bossier | 10,850 | -10,437 |
| Haynesville | 11,402 | -10,989 |
| Jurassic | 11,430 | -11,017 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,654 | 7,718 | Perforated |
| 10,606 | 10,614 | Perforated |
| 11,432 | 11,442 | Perforated |
| 11,474 | 11,484 | Perforated |
| 11,574 | 11,581 | Perforated |
| 11,612 | 11,618 | Perforated |
| 11,638 | 11,658 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 3,860 | 12.25 | 1,260 S |
| 5.5 | 11,482 | 8.75 | 1,690 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 20, 2017 | Apr 6, 2017 | — |
| 00 | Jun 27, 2016 | Apr 6, 2016 | Yes |
| 00 | Apr 20, 2005 | Jan 31, 2005 | — |
| 00 | Mar 7, 2005 | Oct 7, 2004 | Yes |
| 00 | Dec 30, 2004 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-067-30744 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-067-30744 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/06730744, documented in the API reference.