WELL · 42-067-30775 · DISTRICT 6
Haggard #1
Cass County · Linden East ( Cotton Valley) field · Producing · Vertical
Haggard #1 (API 42-067-30775) is a well in Cass County operated by Stetson Petroleum Corp., completed April 17, 2013 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit, issued November 9, 2012, permitted to 12,000 ft.
It was permitted by Stroud Petroleum, Inc. and has since transferred to Stetson Petroleum Corp. on the wellbore schedule.
Completion filings report 4 formation tops, including BMA, Travis Peak, Cotton Valley, Bossier.
Its lease has reported 7.94K barrels of oil since April 2013, last reporting in July 2026.
Operator of record
Permitted by Stroud Petroleum, Inc.; the EWA schedule now lists a different operator.
- Based in
- Rollins, MT
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Nov 12, 2025
- Permits on file
- 41
- Phone
- (406) 844-3600
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Stetson Petroleum Corp. |
| Production reports | Stetson Petroleum Corp.through Apr 2026 |
| Latest permit | Stroud Petroleum, Inc.Nov 9, 2012 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 12,000
- total depth, ft
- 1
- permits on file
- Nov 9, 2012
- last permit issued
- Apr 17, 2013
- completed
- 7.94K
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Apr 2013 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Apr 17, 2013
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active – Extension (X)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Haggard O-6-15226 | Linden, East ( Cotton Valley) | Stetson Petroleum Corp. | 1 | 7.94K | 0 | Apr 2013 – Jul 2026 |
Oil, barrels lease total
Last 12 months 372 · prior 12 359(+4%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Stroud Petroleum, Inc.Apr 2013 → Jan 2021
- 2Stetson Petroleum Corp.Feb 2021 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 750420-99 | Drill | Stroud Petroleum, Inc. | Oct 24, 2012 | Nov 9, 2012 | Feb 9, 2013 | 12,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-6-15226 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 260 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| BMA | 6,000 | -5,740 |
| Travis Peak | 6,900 | -6,640 |
| Cotton Valley | 8,500 | -8,240 |
| Bossier | 10,350 | -10,090 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 10,120 | 10,146 | Perforated |
| 10,190 | 10,216 | Perforated |
| 10,316 | 10,330 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,825 | 11 | 520 S |
| 4.5 | 10,500 | 7.875 | 1,085 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 9, 2013 | Aug 13, 2013 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-067-30775 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-067-30775 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/06730775, documented in the API reference.