WELL · 42-071-30795 · DISTRICT 3

Gripon H. A. a/C #1 #30

Plugged

Chambers County · Anahuac (Chgd. Shallow Sds.) field  · Vertical

Gripon H. A. A/C #1 #30 (API 42-071-30795) is a plugged well in Chambers County, plugged September 28, 1994, last operated by Exxon Corp..

The RRC has issued 2 drilling permits between 1977 and 1991, permitted to 7,700 ft.

Completion filings report 3 formation tops, including Discorbis, Marginulina, Frio.

Its 2 leases have reported 284K barrels of oil and 1.42M mcf of gas since January 1993, last reporting in July 2026. The leases carry 25 wells, so these are lease totals, not this well alone.

Operator of record

Exxon Corp.

Based in
Houston, TX
P-5 status
See remarks (S)
P-5 last filed
Mar 15, 1999
Permits on file
19,549
Phone
(713) 431-1125

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleExxon Corp.
Production reportsTexas Petroleum Investment Co.through Apr 2026
Latest permitExxon Corp.Sep 10, 1991

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,700
total depth, ft
2
permits on file
Sep 10, 1991
last permit issued
Nov 6, 1991
completed
284K
cumulative oil, bbl
1.42M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 6, 1991
Shut in
—
Plugged
Sep 28, 1994

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 25 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Gripon, H. A. a/C #1 O-3-76AnahuacTexas Petroleum Investment Co.24284K1.42MJan 1993 – Jul 2026
Gripon, H. A. a/C #1 G-3-140623Anahuac (Chgd. Shallow Sds.)Exxon Corp.1054Jan 1993 – Sep 1994

Oil, barrels lease total

Last 12 months 1,531 · prior 12 3,334(-54%)

0200400202420252026

Gas, mcf lease total

Last 12 months 9 · prior 12 1,835(-100%)

0100200300202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exxon Corp.Jan 1993 → Mar 2000
  2. 2Exxon Mobil CorporationApr 2000 → Jun 2003
  3. 3Texas Petroleum Investment Co.Jul 2003 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
391666-99RecompletionExxon Corp.Sep 5, 1991Sep 10, 1991Feb 26, 19917,200
9745-99DrillExxon Corp.Sep 28, 1977Sep 28, 1977—7,700

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-3-140623————
—— O-3-76————

Formation tops

As filed on W-2/G-1. Subsea from 33 ft elevation.Download CSV →

FormationMD ftSubsea
Discorbis6,138-6,105
Marginulina6,684-6,651
Frio6,831-6,798

Perforations

Perforated and open-hole intervals.

FromToType
1,6441,648Perforated
6,0346,847Perforated
6,8646,874Perforated
6,9576,963Perforated
6,9686,972Perforated
6,9736,986Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
1473——
8.6251,03511325 S
8.6251,03611325 S
2.3756,214——
5.57,1857.875765 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 16, 1992Mar 27, 1992Yes
00Mar 9, 1992Feb 18, 1992Yes
00Feb 26, 1992——
00May 16, 1989Apr 11, 1989—
00Nov 4, 1987Oct 22, 1987—
00Jun 9, 1986May 29, 1986—
00Apr 15, 1986Mar 19, 1986Yes
00Jan 12, 1984Oct 19, 1977—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/07130795, documented in the API reference.