WELL · 42-071-31575 · DISTRICT 3

Broussard - Hebert a/C 1 #44

N

Chambers County  · Vertical

Broussard - Hebert A/C 1 #44 (API 42-071-31575) is a permitted well in Chambers County filed by Texas Petroleum Investment CO.; no completion report is on file yet.

The RRC has issued 5 drilling permits between 1984 and 2005, permitted to 8,575 ft.

Completion filings report one formation top, including Frio.

Operator of record

Texas Petroleum Investment Co.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Oct 1, 2025
Permits on file
233
Phone
(713) 789-9225

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsTexas Petroleum Investment Co.through Jun 2007
Latest permitTexas Petroleum Investment Co.Aug 5, 2005
8,575
total depth, ft
5
permits on file
Aug 5, 2005
last permit issued
—
completed
0
cumulative oil, bbl
142K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Broussard - Hebert a/C 1 G-3-211578Anahuac (FB a-2, Frio 13)Texas Petroleum Investment Co.10134KAug 2005 – Jul 2026
Broussard-Hebert a/C 1 G-3-168212AnahuacTexas Petroleum Investment Co.100Feb 1998 – Aug 2005
Broussard-Hebert a/C 1 G-3-120781Anahuac (Discorbis 6200)Exxon Corp.108.28KJan 1993 – Feb 1998

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exxon Corp.Jan 1993 → Mar 1993
  2. 2Texas Petroleum Investment Co.Aug 2005 → Jun 2007

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
604391-99RecompletionTexas Petroleum Investment Co.Aug 3, 2005Aug 5, 2005—8,075
469782-99RecompletionExxon Corp.Nov 6, 1997Nov 14, 1997Jan 28, 19987,497
292689-99RecompletionExxon Corp.Dec 10, 1985Dec 11, 1985—8,075
261750-99DrillExxon Corp.Dec 17, 1984Dec 17, 1984—8,575
236450-99DrillExxon Corp.Jun 11, 1984Apr 12, 1984Aug 30, 19848,575

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-3-120781————
—— G-3-168212————
—— G-3-211578————

Formation tops

As filed on W-2/G-1. Subsea from 36 ft elevation.Download CSV →

FormationMD ftSubsea
FrioFRIO 16,964-6,928
FrioFRIO-16,964-6,928
FrioFRIO I6,964-6,928
FrioFRIO 117,546-7,510
FrioFRIO II7,546-7,510
FrioFRIO 11E7,679-7,643
FrioFRIO II E7,679-7,643
FrioFRIO 137,990-7,954

Perforations

Perforated and open-hole intervals.

FromToType
6,2016,209Perforated
6,8006,814Perforated
7,5407,562Perforated
7,5467,562Perforated
8,0188,028Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,04114.751,050 S
7.6258,0759.8751,828 S
—8,0759.875904 S
7.625—9.875924 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 20, 2005Sep 29, 2005Yes
00Oct 18, 2005——
00Jun 17, 1998May 27, 1998Yes
00Jun 5, 1998——
00May 6, 1986Apr 18, 1986Yes
00May 1, 1986——
00Nov 4, 1985Oct 14, 1985Yes
00Jan 28, 1985Jan 10, 1985—
00Jan 23, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/07131575, documented in the API reference.