WELL · 42-071-32317 · DISTRICT 3
State Tract 251 #5
Chambers County · Vinceburg (Lox B) field · Directional
State Tract 251 #5 (API 42-071-32317) is a plugged well in Chambers County, plugged August 4, 2015, last operated by Davis Petroleum Corp..
The RRC has issued one drilling permit (amended twice), issued October 17, 2005, permitted to 19,000 ft.
Completion filings report 2 formation tops, including Miocene (undifferentiated), Frio.
Its lease has reported 130K barrels of oil and 258K mcf of gas since March 2006, last reporting in September 2015.
Operator of record
- Based in
- Houston, TX
- P-5 status
- Delinquent (D)
- P-5 last filed
- Mar 6, 2020
- Permits on file
- 98
- Phone
- (713) 968-7068
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Davis Petroleum Corp. |
| Production reports | Davis Petroleum Corp.through Mar 2013 |
| Latest permit | Davis Petroleum Corp.Oct 17, 2005 |
- 19,000
- total depth, ft
- 3
- permits on file
- Oct 17, 2005
- last permit issued
- Mar 6, 2006
- completed
- 130K
- cumulative oil, bbl
- 258K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Mar 2006 THROUGH Sep 2015
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 6, 2006
- Shut in
- —
- Plugged
- Aug 4, 2015
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| State Tract 251 O-3-24887 | Vinceburg (Lox B) | Davis Petroleum Corp. | 1 | 130K | 258K | Mar 2006 – Sep 2015 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Davis Petroleum Corp.Mar 2006 → Mar 2013
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 607971-97 | Drill | Davis Petroleum Corp. | Jun 16, 2006 | Oct 17, 2005 | Dec 2, 2005 | 19,000 |
| 607971-98 | Drill | Davis Petroleum Corp. | Jan 30, 2006 | Oct 17, 2005 | Dec 2, 2005 | 16,500 |
| 607971-99 | Drill | Davis Petroleum Corp. | Oct 17, 2005 | Oct 17, 2005 | Dec 2, 2005 | 14,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-3-24887 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 43 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Miocene (undifferentiated)BASE OF MIOCENE | 6,750 | -6,707 |
| FrioTOP OF FRIO | 8,000 | -7,957 |
| FrioBASE OF FRIO | 9,930 | -9,887 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 15,047 | 15,060 | Perforated |
| 15,104 | 15,109 | Perforated |
| 15,113 | 15,121 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 3,170 | 17.5 | 2,130 S |
| 7 | 10,602 | 8.5 | 85 S |
| 9.625 | 11,054 | 12.25 | 1,134 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 20, 2007 | Sep 1, 2006 | Yes |
| 00 | Sep 19, 2006 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-071-32317 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-071-32317 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/07132317, documented in the API reference.