TEXAS · WELLS · CHEROKEE COUNTY · API 42-073-30288 · DISTRICT 06

Winifree #1

Plugged

Cherokee County  · Vertical

Winifree #1 (API 42-073-30288) is a plugged well in Cherokee County, plugged May 18, 1983, last operated by Wessely Energy Corporation.

The RRC has issued 2 drilling permits between 1977 and 1981, permitted to 13,186 ft.

Operator of record

Wessely Energy Corporation

Based in
Dallas, TX
P-5 status
Inactive (I)
P-5 last filed
Oct 21, 1983
Permits on file
106
Phone
(214) 742-2396

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitWessely Energy CorporationJul 17, 1981
13,186
total depth, ft
2
permits on file
Jul 17, 1981
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
May 18, 1983

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Only the permit record exists for this well so far, here and in the RRC's wellbore query. Completion reports, formation tops, lease production, and the scanned filings appear once the operator files a completion report, typically months after drilling. Petrora refreshes the wellbore file weekly, so a filing from the last few days may reach the RRC before it shows here. How long each source takes →

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
126834-99OtherWessely Energy CorporationJul 17, 1981Jul 17, 1981Jul 16, 198110,400
2898-99DrillDelta Drilling Co.Nov 8, 1977Nov 8, 1977Sep 13, 197713,186

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/07330288, documented in the API reference.