TEXAS · WELLS · CHEROKEE COUNTY · TRAVIS -A- LEASE · API 42-073-30390 · DISTRICT 06
Travis -A- #1
Cherokee County · Percy Wheeler (Travis Peak) field · Producing · Vertical
Travis -A- #1 (API 42-073-30390) is a well in Cherokee County operated by Ursus Oil And Gas, completed September 3, 1980 and listed as producing on the RRC schedule, shut in August 1, 2026.
The RRC has issued one drilling permit (amended once), issued May 12, 1980, permitted to 9,850 ft.
It was permitted by Dallas Production, Inc. and has since transferred to Ursus Oil And Gas on the wellbore schedule.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by Dallas Production, Inc.; the EWA schedule now lists a different operator.
- Based in
- Tyler, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Apr 29, 2026
- Phone
- (903) 343-7998
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Ursus Oil and Gas |
| Production reports | Ursus Oil and Gasthrough Mar 2026 |
| Latest permit | Dallas Production, Inc.May 12, 1980 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 9,850
- total depth, ft
- 2
- permits on file
- May 12, 1980
- last permit issued
- Sep 3, 1980
- completed
- 0
- cumulative oil, bbl
- 467K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Sep 3, 1980
- Shut in
- Aug 1, 2026
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Travis -A- G-6-90859 | Percy Wheeler (Travis Peak) | Ursus Oil and Gas | 1 | 0 | 467K | Jan 1993 – Jul 2026 |
Gas, mcf lease total
Last 12 months 4,550 · prior 12 7,320(-38%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Dallas Production, Inc.Jan 1993 → Jan 2009
- 2Hibbard Energy, LPFeb 2009 → Aug 2023
- 3Ursus Oil and GasSep 2023 → Mar 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 80939-97 | Drill | Dallas Production, Inc. | Jan 29, 1997 | May 12, 1980 | — | 10,000 |
| 80939-99 | Drill | Pitts Oil Co.-Dallas Prod. Inc. | May 12, 1980 | May 12, 1980 | May 23, 1980 | 9,850 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Sep 3, 1980 | Travis -A- G-6-90859 | Percy Wheeler (Travis Peak) | Ursus Oil and Gas | Producing · shut in Aug 1, 2026 | 9,850 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 9,322 | 9,518 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,720 | 12.25 | 680 S |
| 2.375 | 9,140 | — | — |
| 4.5 | 9,849 | 7.875 | 750 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 1984 | Oct 20, 1980 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-073-30390 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-073-30390 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/07330390, documented in the API reference.