TEXAS · WELLS · CHEROKEE COUNTY · API 42-073-30583 · DISTRICT 06

Cole Unit #1

Plugged

Cherokee County  · Vertical

Cole Unit #1 (API 42-073-30583) is a plugged well in Cherokee County, plugged January 13, 1987, last operated by Phylko Energy Corporation.

The RRC has issued 2 drilling permits between 1984 and 1986, permitted to 10,750 ft.

Operator of record

Phylko Energy Corporation

Based in
Houston, TX
P-5 status
Inactive (I)
P-5 last filed
Jul 30, 1998
Permits on file
111
Phone
(713) 266-2650

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitPhylko Energy CorporationNov 14, 1986
10,750
total depth, ft
2
permits on file
Nov 14, 1986
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Jan 13, 1987

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Only the permit record exists for this well so far, here and in the RRC's wellbore query. Completion reports, formation tops, lease production, and the scanned filings appear once the operator files a completion report, typically months after drilling. Petrora refreshes the wellbore file weekly, so a filing from the last few days may reach the RRC before it shows here. How long each source takes →

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
322787-99ReenterPhylko Energy CorporationNov 6, 1986Nov 14, 1986—4,650
238235-99DrillUnion Texas Petroleum Corp.Apr 25, 1984May 9, 1984May 23, 198410,750

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/07330583, documented in the API reference.