WELL · 42-073-31549 · DISTRICT 6
Thompson #2H
Cherokee County · Overton (Cotton Valley Sand) field · Producing · Horizontal
Thompson #2H (API 42-073-31549) is a horizontal well in Cherokee County operated by Valence Operating Company, completed July 12, 2025 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit, issued April 13, 2016, permitted to 11,800 ft.
Completion filings report 10 formation tops, including Nacatoch, Sub-Clarksville, Woodbine, Paluxy.
No lease production has been reported under this well’s leases.
Operator of record
- Based in
- Kingwood, TX
- P-5 status
- Active (A)
- P-5 last filed
- Jun 4, 2026
- Permits on file
- 990
- Phone
- (281) 359-3659
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Valence Operating Company |
| Production reports | Valence Operating Companythrough Apr 2026 |
| Latest permit | Valence Operating CompanyApr 13, 2016 |
- 11,800
- total depth, ft
- 1
- permits on file
- Apr 13, 2016
- last permit issued
- Jul 12, 2025
- completed
- 0
- cumulative oil, bbl
- 2.68M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Aug 2016 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Jul 12, 2025
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Thompson G-6-281537 | Overton (Cotton Valley Sand) | Valence Operating Company | 1 | 0 | 2.68M | Aug 2016 – Jul 2026 |
Gas, mcf lease total
Last 12 months 92,468 · prior 12 94,369(-2%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Valence Operating CompanyAug 2016 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 814935-99 | Drill | Valence Operating Company | Apr 8, 2016 | Apr 13, 2016 | Apr 20, 2016 | 11,800 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-6-281537 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 432 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Nacatoch | 2,500 | -2,068 |
| Sub-Clarksville | 3,910 | -3,478 |
| Woodbine | 3,970 | -3,538 |
| Paluxy | 5,380 | -4,948 |
| Glen Rose | 5,660 | -5,228 |
| Rodessa | 7,285 | -6,853 |
| James Lime | 7,745 | -7,313 |
| PettitPETTET | 7,980 | -7,548 |
| Travis Peak | 8,250 | -7,818 |
| Cotton Valley | 10,170 | -9,738 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 12,236 | 18,480 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 4,268 | 12.25 | 1,545 S |
| 9.625 | 4,268 | 12.25 | 1,545 S |
| 5.5 | 18,610 | 8.75 | 5,601 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 8, 2025 | Jul 14, 2025 | — |
| 00 | Jan 24, 2023 | Jan 5, 2023 | — |
| 00 | Sep 15, 2017 | Jun 1, 2017 | — |
| 00 | Dec 27, 2016 | Oct 19, 2016 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-073-31549 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-073-31549 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/07331549, documented in the API reference.