WELL · 42-077-20164 · DISTRICT 9

Shoemaker #1

Plugged

Clay County · Dillard SE. (Ellenburger) field  · Vertical

Shoemaker #1 (API 42-077-20164) is a plugged well in Clay County, plugged August 28, 1992, last operated by Marchman J. E..

The RRC has issued one drilling permit, issued October 18, 1989, permitted to 6,495 ft.

It was permitted by American Exploration Company and has since transferred to Marchman J. E. on the wellbore schedule.

Completion filings report 6 formation tops, including Palo Pinto, Bryson, Caddo, Marble Falls.

Operator of record

Marchman J. E.

Permitted by American Exploration Company; the EWA schedule now lists a different operator.

Based in
Graham, TX
P-5 status
Inactive (I)
P-5 last filed
Jun 24, 2008
Permits on file
5
Phone
(940) 549-3280

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleAmerican Exploration Company
Production reportsnone
Latest permitAmerican Exploration CompanyOct 18, 1989
6,495
total depth, ft
1
permits on file
Oct 18, 1989
last permit issued
Sep 19, 1989
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Sep 19, 1989
Shut in
—
Plugged
Aug 28, 1992

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
— G-13-44482——000—
— O-13-27633——000—

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
365156-99RecompletionAmerican Exploration CompanyOct 16, 1989Oct 18, 1989—6,495

Completions

CompletedLeaseFieldOperatorStatusDepth
Sep 19, 1989Shoemaker O-13-27633Dillard SE. (Ellenburger)Marchman J. E.Plugged—
Apr 13, 1968Shoemaker G-13-44482Dillard SW. (Conglomerate 5780)American Exploration CompanyPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 1,115 ft elevation.Download CSV →

FormationMD ftSubsea
Palo PintoPALO PINTO LIME1,290-175
BrysonBRYSON LIME4,065-2,950
CaddoCADDO LIME5,564-4,449
Marble Falls5,894-4,779
BarnettBARNETT SHALE6,130-5,015
Ellenburger6,372-5,257

Perforations

Perforated and open-hole intervals.

FromToType
5,7965,808Perforated
6,4576,467Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62538512.25265 S
4.56,4957.875380 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 20, 1990Oct 27, 1989Yes
00Mar 5, 1990——
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/07720164, documented in the API reference.