WELL · 42-077-30674 · DISTRICT 9

Cozart L. E. #1 #1

Shut in

Clay County · Dillard W. (Caddo) field · Shut IN  · Vertical

Cozart L. E. #1 #1 (API 42-077-30674) is a well in Clay County operated by Stephens & Johnson Operating CO., completed February 4, 1978 and listed as shut in on the RRC schedule, shut in July 1, 2023.

The RRC has issued one drilling permit, issued February 8, 1978, permitted to 6,100 ft.

It was permitted by Taylor Oper. CO. and has since transferred to Stephens & Johnson Operating CO. on the wellbore schedule.

Its 2 leases have reported 20.9K barrels of oil and 72.2K mcf of gas since January 1993, last reporting in July 2026. The leases carry 3 wells, so these are lease totals, not this well alone.

Operator of record

Stephens & Johnson Operating Co.

Permitted by Taylor Oper. Co.; the EWA schedule now lists a different operator.

Based in
Wichita Falls, TX
P-5 status
Active – Extension (X)
P-5 last filed
Jul 2, 2026
Permits on file
360
Phone
(940) 723-2166

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleStephens & Johnson Operating Co.
Production reportsStephens & Johnson Operating Co.through Apr 2023
Latest permitTaylor Oper. Co.Feb 8, 1978

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,100
total depth, ft
1
permits on file
Feb 8, 1978
last permit issued
Feb 4, 1978
completed
20.9K
cumulative oil, bbl
72.2K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Feb 4, 1978
Shut in
Jul 1, 2023
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Cozart, L. E. O-13-18403Dillard, S. (Marble Falls)Stephens & Johnson Operating Co.100Jan 1993 – Jul 2026
Cozart, L. E. #1 O-13-18740Dillard, W. (Caddo)Stephens & Johnson Operating Co.220.9K72.2KJan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1S & J Operating Co.Jan 1993 → Aug 1993
  2. 2Stephens & Johnson Operating Co.Sep 1993 → Aug 2022

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
17884-99RecompletionTaylor Oper. Co.Feb 8, 1978Feb 8, 1978—5,800

Completions

CompletedLeaseFieldOperatorStatusDepth
Feb 4, 1978Cozart L. E. #1 O-13-18740Dillard W. (Caddo)Stephens & Johnson Operating Co.Shut IN · shut in Jul 1, 20236,100
May 16, 1977Cozart L. E. O-13-18403Dillard S. (Marble Falls)Stephens & Johnson Operating Co.Shut IN · shut in Sep 1, 20126,100

Perforations

Perforated and open-hole intervals.

FromToType
—5,734Perforated
—6,052Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62533712.25200 S
4.56,1007.875225 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 12, 1984Feb 13, 1978—
00Jan 12, 1984May 26, 1977—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/07730674, documented in the API reference.