WELL · 42-077-31573 · DISTRICT 9
Cozart Doc #2
Clay County · Buffalo Springs field · Vertical
Cozart Doc #2 (API 42-077-31573) is a plugged well in Clay County, plugged September 7, 1995, last operated by Bennett Production Corporation.
The RRC has issued 2 drilling permits between 1979 and 1984, permitted to 6,491 ft.
Its lease has reported 6.2K barrels of oil and 10.2K mcf of gas since January 1993, last reporting in November 1995. The lease carries 3 wells, so these are lease totals, not this well alone.
Operator of record
Bennett Production Corporation
- Based in
- Bowie, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Nov 20, 2023
- Permits on file
- 134
- Phone
- (940) 872-1183
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Bennett Production Corporationthrough Sep 1995 |
| Latest permit | Bennett Production CorporationApr 6, 1984 |
- 6,491
- total depth, ft
- 2
- permits on file
- Apr 6, 1984
- last permit issued
- May 25, 1984
- completed
- 6.2K
- cumulative oil, bbl
- 10.2K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Nov 1995
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- May 25, 1984
- Shut in
- —
- Plugged
- Sep 7, 1995
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Cozart, Doc O-13-19596 | Buffalo Springs | Bennett Production Corporation | 3 | 6.2K | 10.2K | Jan 1993 – Nov 1995 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Bennett Production CorporationJan 1993 → Sep 1995
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 234719-99 | Other | Bennett Production Corporation | Apr 3, 1984 | Apr 6, 1984 | — | 1,750 |
| 65129-99 | Drill | Bennett Production Corporation | Nov 30, 1979 | Nov 30, 1979 | — | 6,491 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| May 25, 1984 | Cozart Doc O-13-19596 | Buffalo Springs | Bennett Production Corporation | Plugged | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,607 | 1,613 | Perforated |
| 1,617 | 1,625 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 456 | 12.75 | 260 sx |
| 5 | 1,844 | 7.875 | 300 sx |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 20, 1984 | Jul 19, 1984 | — |
| 00 | Jul 31, 1984 | Jul 19, 1984 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-077-31573 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-077-31573 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 35.2K
- bbl, last 12 reported months
- 207K
- bbl, all reported
- Jun 1995
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000051776 | W-14 Disposal | Plugged Oct 6, 1995 | 150 | 500 | 1,600–1,630 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 35,200 · prior 12 36,130(-3%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/07731573, documented in the API reference.