WELL · 42-077-32152 · DISTRICT 9
Seigler D. L. #1D
Clay County · Dillard W. (Caddo) field · Vertical
Seigler D. L. #1D (API 42-077-32152) is a plugged well in Clay County, plugged March 27, 2009, last operated by L&R Tank Trucks.
The RRC has issued 2 drilling permits between 1981 and 1982, permitted to 5,836 ft.
It was permitted by Buffalo Injection System, Inc. and has since transferred to L&R Tank Trucks on the wellbore schedule.
Operator of record
Permitted by Buffalo Injection System, Inc.; the EWA schedule now lists a different operator.
- Based in
- Bowie, TX
- P-5 status
- Delinquent (D)
- P-5 last filed
- May 16, 2013
- Permits on file
- 6
- Phone
- (940) 872-5319
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | none |
| Latest permit | Buffalo Injection System, Inc.May 6, 1982 |
- 5,836
- total depth, ft
- 2
- permits on file
- May 6, 1982
- last permit issued
- Jul 19, 1997
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jul 19, 1997
- Shut in
- —
- Plugged
- Mar 27, 2009
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Seigler, D. L. O-13-26351 | Dillard, W. (Caddo) | L&R Tank Trucks | 1 | 0 | 0 | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 159951-99 | Other | Buffalo Injection System, Inc. | May 6, 1982 | May 6, 1982 | — | 5,836 |
| 114732-99 | Drill | Felderhoff Production Co. | Apr 10, 1981 | Apr 10, 1981 | — | 5,836 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Jul 19, 1997 | Seigler D. L. O-13-26351 | Dillard W. (Caddo) | L&R Tank Trucks | Plugged | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,266 | 2,286 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 266 | 12.25 | 60 S |
| 8.625 | 266 | 12.5 | 60 S |
| 2.875 | 2,120 | 4.5 | 100 S |
| 4.5 | 2,363 | 6.75 | 500 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 6, 1998 | Oct 3, 1997 | — |
| 00 | Nov 5, 1986 | Sep 23, 1986 | — |
| 00 | Oct 2, 1986 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-077-32152 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-077-32152 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 99.8K
- bbl, last 12 reported months
- 1.91M
- bbl, all reported
- Jun 2009
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000061703 | W-14 Disposal | Plugged May 20, 2009 | 2,500 | 1,000 | 2,266–2,286 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 99,786 · prior 12 324,233(-69%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/07732152, documented in the API reference.