TEXAS · WELLS · CLAY COUNTY · API 42-077-34873 · DISTRICT 09

Harris A #1

Plugged

Clay County · Wildcat field  · Vertical

Fields on the latest permit · any of 2
Harris-Price (Caddo) · Harris-Price (Caddo Congl.)
Not one formation; the well must be completed in one of them, and no target formation is stated. The district's wildcat field is also on the permit.

Harris A #1 (API 42-077-34873) is a plugged well in Clay County, plugged January 22, 2004, last operated by Lane Operating Company.

The RRC has issued one drilling permit, issued December 12, 2003, permitted to 6,300 ft.

It was permitted by Lane Operating Company and has since transferred to Lane Operating Company on the wellbore schedule.

Operator of record

Lane Operating Company

Permitted by Lane Operating Company; the EWA schedule now lists a different operator.

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitLane Operating CompanyDec 12, 2003

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,300
total depth, ft
1
permits on file
Dec 12, 2003
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Jan 22, 2004

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Only the permit record exists for this well so far, here and in the RRC's wellbore query. Completion reports, formation tops, lease production, and the scanned filings appear once the operator files a completion report, typically months after drilling. Petrora refreshes the wellbore file weekly, so a filing from the last few days may reach the RRC before it shows here. How long each source takes →

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
539509-99DrillLane Operating CompanyDec 10, 2003Dec 12, 2003Jan 12, 20046,300

Well logs

1 log loaded from the RRC's log index, the latest received Feb 13, 2007. Gamma ray, Resistivity. These are the logs loaded into Petrora from the Railroad Commission's inventories, not necessarily every log run on the well. The RRC holds the files; each opens from its log search for the well. The kind is the RRC's description of the log; the interval is the one filed for it.

Open the RRC's log search for this well ↗
Logas describedFiles Intervalft, as filedDatereceivedSizeMB
ResistivityDUAL INDUCTION FOCUSED GAMMA RAY LOGTIFF670 to 6,193Feb 13, 2007run Jan 21, 2004—

Find logs withinmiles of this well:List →Map →

Search the well logs loaded into Petrora →

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

The logs loaded for this well are under Well logs, with the RRC's log search for it.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/07734873, documented in the API reference.