WELL · 42-077-34993 · DISTRICT 9
Scaling Ranch E #1H
Clay County · Newark East (Barnett Shale) field · Horizontal
Scaling Ranch E #1H (API 42-077-34993) is a plugged horizontal well in Clay County, plugged July 16, 2015, last operated by Eog Resources Inc..
The RRC has issued one drilling permit (amended once), issued January 11, 2008, permitted to 7,500 ft.
Completion filings report 5 formation tops, including Bryson, Etter Limestone, Caddo, Barnett.
Operator of record
- Based in
- Midland, TX
- P-5 status
- Active (A)
- P-5 last filed
- Oct 2, 2025
- Permits on file
- 16,348
- Phone
- (713) 651-7000
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | EOG Resources Inc. |
| Production reports | EOG Resources, Inc.through Apr 2008 |
| Latest permit | EOG Resources, Inc.Jan 11, 2008 |
- 7,500
- total depth, ft
- 2
- permits on file
- Jan 11, 2008
- last permit issued
- Mar 22, 2008
- completed
- 0
- cumulative oil, bbl
- 593
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Mar 2008 THROUGH Mar 2017
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 22, 2008
- Shut in
- —
- Plugged
- Jul 16, 2015
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Scaling Ranch E O-13-31331 | Newark, East (Barnett Shale) | EOG Resources, Inc. | 1 | 0 | 593 | Mar 2008 – Mar 2017 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 652333-98 | Drill | EOG Resources, Inc. | May 7, 2008 | Jan 11, 2008 | Jan 20, 2008 | 7,500 |
| 652333-99 | Drill | EOG Resources, Inc. | Jan 3, 2008 | Jan 11, 2008 | Jan 20, 2008 | 7,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-31331 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,110 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,728 | 9,680 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 2,115 | 12.25 | 980 S |
| 5.5 | 9,810 | 7.875 | 700 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 20, 2009 | Nov 17, 2008 | Yes |
| 00 | Jul 15, 2009 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-077-34993 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-077-34993 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/07734993, documented in the API reference.