WELL · 42-077-35184 · DISTRICT 9
Stine #1
Clay County · Clay County Regular field · Vertical
Stine #1 (API 42-077-35184) is a plugged well in Clay County, plugged January 24, 2022, last operated by Genepa Petroleum Company.
The RRC has issued one drilling permit, issued January 25, 2013, permitted to 2,999 ft.
It was permitted by Dry Fork Production CO., LLC and has since transferred to Genepa Petroleum Company on the wellbore schedule.
Completion filings report 2 formation tops, including Canyon, Ellenburger.
Its lease has reported 463 barrels of oil since February 2013, last reporting in July 2026.
Operator of record
Permitted by Dry Fork Production Co., LLC; the EWA schedule now lists a different operator.
Spring, TX · P-5 Y, filed Apr 4, 2026 · 9 permits on file · (281) 466-7509
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Genepa Petroleum Company |
| Production reports | Genepa Petroleum Companythrough Aug 2018 |
| Latest permit | Dry Fork Production Co., LLCJan 25, 2013 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 2,999
- total depth, ft
- 1
- permits on file
- Jan 25, 2013
- last permit issued
- Feb 22, 2013
- completed
- 463
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Feb 2013 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Feb 22, 2013
- Shut in
- —
- Plugged
- Jan 24, 2022
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Stine O-13-32613 | Clay County Regular | Genepa Petroleum Company | 1 | 463 | 0 | Feb 2013 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Dry Fork Production Co., LLCJul 2013 → Nov 2014
- 2Genepa Petroleum CompanyDec 2014 → Aug 2018
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 755093-99 | Drill | Dry Fork Production Co., LLC | Jan 18, 2013 | Jan 25, 2013 | Feb 15, 2013 | 2,999 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-32613 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 968 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| CanyonCANYON SAND | 1,950 | -982 |
| Ellenburger | 2,400 | -1,432 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,400 | 2,500 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 160 | 12.25 | 125 S |
| 5.5 | 2,796 | 7.875 | 480 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 30, 2013 | Jul 1, 2013 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-077-35184 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-077-35184 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/07735184, documented in the API reference.