WELL · 42-077-35204 · DISTRICT 9
Cody #1
Clay County · Henrietta North (Conglomerate) field · Vertical
Cody #1 (API 42-077-35204) is a plugged well in Clay County, plugged March 31, 2025, last operated by Wise Production Company.
The RRC has issued one drilling permit, issued February 5, 2014, permitted to 6,600 ft.
It was permitted by Bettis, Boyle & Stovall and has since transferred to Wise Production Company on the wellbore schedule.
Completion filings report 10 formation tops, including Bryson, Caddo, Conglomerate, Canyon.
Its lease has reported 18.4K barrels of oil since June 2014, last reporting in July 2025.
Operator of record
Permitted by Bettis, Boyle & Stovall; the EWA schedule now lists a different operator.
Bowie, TX · P-5 Y, filed Aug 4, 2025 · 13 permits on file · (940) 872-0472
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Wise Production Company |
| Production reports | Wise Production Companythrough Sep 2024 |
| Latest permit | Bettis, Boyle & StovallFeb 5, 2014 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 6,600
- total depth, ft
- 1
- permits on file
- Feb 5, 2014
- last permit issued
- Jul 16, 2014
- completed
- 18.4K
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jun 2014 THROUGH Jul 2025
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jul 16, 2014
- Shut in
- —
- Plugged
- Mar 31, 2025
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Cody O-13-32918 | Henrietta, North (Conglomerate) | Wise Production Company | 1 | 18.4K | 0 | Jun 2014 – Jul 2025 |
Oil, barrels lease total
Last 12 months 0 · prior 12 286(-100%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Bettis, Boyle & StovallJul 2014 → Jan 2019
- 2Wise Production CompanyMar 2019 → Sep 2024
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 777276-99 | Drill | Bettis, Boyle & Stovall | Jan 14, 2014 | Feb 5, 2014 | May 19, 2014 | 6,600 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-32918 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 867 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Bryson | 4,750 | -3,883 |
| Caddo | 5,972 | -5,105 |
| Conglomerate | 6,134 | -5,267 |
| Canyon | — | — |
| CiscoCISCO SERIES | — | — |
| Ellenburger | — | — |
| GunsightGUNSIGHT SAND | — | — |
| Mississippian | — | — |
| StrawnSTRAWN SAND | — | — |
| Thomas Sand | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,225 | 6,230 | Open hole |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 377 | 12.25 | 205 S |
| 4.5 | 6,225 | 7.875 | 450 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 18, 2014 | Jul 17, 2014 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-077-35204 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-077-35204 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/07735204, documented in the API reference.