TEXAS · WELLS · COCHRAN COUNTY · MASTEN, F. O. LEASE · API 42-079-30908 · DISTRICT 7B

Masten F. O. #12

Plugged

Cochran County · Levelland field  · Vertical

Masten F. O. #12 (API 42-079-30908) is a plugged well in Cochran County, plugged January 26, 2007, last operated by Ctoc Energy LLC.

The RRC has issued one drilling permit, issued May 9, 1978, permitted to 5,200 ft.

It was permitted by Atlantic Richfield CO. and has since transferred to Ctoc Energy LLC on the wellbore schedule.

Its lease has reported 334K barrels of oil and 178K mcf of gas since January 1993, last reporting in July 2026. The lease carries 23 wells, so these are lease totals, not this well alone.

Operator of record

Ctoc Energy LLC

Permitted by Atlantic Richfield Co.; the EWA schedule now lists a different operator.

Based in
Fort Worth, TX
P-5 status
Active (A)
P-5 last filed
Apr 24, 2026
Phone
(817) 334-7804

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleCross Timbers Energy LLC
Production reportsCross Timbers Energy, LLCthrough Feb 2025
Latest permitAtlantic Richfield Co.May 9, 1978

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,200
total depth, ft
1
permits on file
May 9, 1978
last permit issued
Oct 15, 1996
completed
334K
cumulative oil, bbl
178K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Oct 15, 1996
Shut in
—
Plugged
Jan 26, 2007

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 23 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Masten, F. O. O-11-61980LevellandCross Timbers Energy, LLC23334K178KJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 0 · prior 12 463(-100%)

050100202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Anadarko Petroleum CorporationJan 1993 → Nov 2004
  2. 2Merit Energy CompanyDec 2004 → Dec 2013
  3. 3Cross Timbers Energy, LLCJan 2014 → Feb 2025

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
23785-99DrillAtlantic Richfield Co.May 9, 1978May 9, 1978Sep 8, 19785,200

Completions

CompletedLeaseFieldOperatorStatusDepth
Oct 15, 1996Masten F. O. O-11-61980LevellandCtoc Energy LLCPlugged—

Perforations

Perforated and open-hole intervals.

FromToType
4,9795,063Perforated
—5,063Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62546512.25350 S
8.625465—350 S
5.55,1607.8751,700 S
5.55,160—1,700 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 28, 1998Oct 24, 1996—
00Jun 4, 1991May 23, 1991—
00Jan 12, 1984Oct 23, 1978—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
561K
bbl, all reported
Feb 2007
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000075082H-1 InjectionPlugged Feb 12, 20073002,4804,979–5,063

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120062007

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/07930908, documented in the API reference.