WELL · 42-081-30008 · DISTRICT 7

Durham #2

N

Coke County · Bloodworth NE. (5750 Canyon) field  · Vertical

Durham #2 (API 42-081-30008) is a well in Coke County operated by O.G.P. Operating Inc., completed March 27, 1979.

The RRC has issued one drilling permit, issued January 24, 1979, permitted to 6,240 ft.

It was permitted by Petrolero Exploration, Inc. and has since transferred to O.G.P. Operating Inc. on the wellbore schedule.

Its 2 leases have reported 2.13K barrels of oil and 54.8K mcf of gas since January 1993, last reporting in July 2026. The leases carry 5 wells, so these are lease totals, not this well alone.

Operator of record

O.G.P. Operating Inc.

Permitted by Petrolero Exploration, Inc.; the EWA schedule now lists a different operator.

Based in
Dallas, TX
P-5 status
Active (A)
P-5 last filed
Feb 25, 2026
Permits on file
39
Phone
(214) 696-2393

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleO.G.P. Operating Inc.
Production reportsQuail Ridge Petroleum LLCthrough Mar 2026
Latest permitPetrolero Exploration, Inc.Jan 24, 1979

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,240
total depth, ft
1
permits on file
Jan 24, 1979
last permit issued
Mar 27, 1979
completed
2.13K
cumulative oil, bbl
54.8K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 27, 1979
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 5 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Durham G-9-210281Bloodworth, NE. (5750 Canyon)Quail Ridge Petroleum LLC1029.6KMay 2005 – Jul 2026
Durham O-9-7798Bloodworth, NE. (5750 Canyon)O.G.P. Operating, Inc.42.13K25.2KJan 1993 – Mar 2008

Gas, mcf lease total

Last 12 months 290 · prior 12 978(-70%)

050100150202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Genie CorporationJan 1993 → Nov 1993
  2. 2R & P OperatingJan 1994 → Aug 1994
  3. 3Alexander Resources, Inc.Sep 1994 → May 1995
  4. 4Tanglewood ProductionJun 1995 → Jun 1996
  5. 5Momentum Oil CompanyJul 1996 → Jun 2001
  6. 6Lone Star Oil Co.Jul 2001 → Dec 2001
  7. 7Hughes, Bob Oil CompanyJan 2002 → Nov 2003
  8. 8O.G.P. Operating, Inc.Dec 2003 → May 2017
  9. 9Bustamante Oil CompanyJun 2017 → Mar 2022
  10. 10Energy Onramp LLCApr 2022 → Aug 2024
  11. 11Quail Ridge Petroleum LLCSep 2024 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
41369-99OtherPetrolero Exploration, Inc.Jan 24, 1979Jan 24, 1979—6,240

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-9-210281————
—— O-9-7798————

Perforations

Perforated and open-hole intervals.

FromToType
5,6575,671Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62529512.25—
2.3755,591——
4.55,8097.875900 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 3, 2005Jun 10, 2005—
00Aug 30, 2005——
00Jan 12, 1984Mar 30, 1979—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/08130008, documented in the API reference.