TEXAS · WELLS · COKE COUNTY · API 42-081-31143 · DISTRICT 6E

Pruitt #2

Plugged

Coke County · Leppart (Palo Pinto) field  · Vertical

Pruitt #2 (API 42-081-31143) is a plugged well in Coke County, plugged August 20, 1986, last operated by Walsh & Watts Inc..

The RRC has issued one drilling permit, issued September 1, 1982, permitted to 4,700 ft.

Operator of record

Walsh & Watts Inc.

Based in
Aledo, TX
P-5 status
Active (A)
P-5 last filed
Dec 2, 2025
Permits on file
361
Phone
(469) 428-3381

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleWalsh & Watts Inc.
Production reportsnone
Latest permitWalsh & Watts, Inc.Sep 1, 1982
4,700
total depth, ft
1
permits on file
Sep 1, 1982
last permit issued
Oct 22, 1982
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Oct 22, 1982
Shut in
—
Plugged
Aug 20, 1986

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
170684-99DrillWalsh & Watts, Inc.Sep 1, 1982Sep 1, 1982—4,700

Completions

CompletedLeaseFieldOperatorStatusDepth
Oct 22, 1982Pruitt O-9-8561Leppart (Palo Pinto)Walsh & Watts Inc.Plugged—

Perforations

Perforated and open-hole intervals.

FromToType
4,3944,455Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62523511150 S
2.3754,400——
5.54,6007.875770 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 12, 1984Oct 28, 1982—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/08131143, documented in the API reference.