WELL · 42-081-31153 · DISTRICT 7

Jameson Etal 1-A #1-A

N

Coke County · Bloodworth N. (Canyon 5650) field  · Vertical

Jameson Etal 1-A #1-A (API 42-081-31153) is a well in Coke County operated by Jim-Bob Oil Company, completed September 16, 1996.

The RRC has issued one drilling permit, issued October 12, 1982, permitted to 6,900 ft.

It was permitted by Bodan Oil & Gas Company and has since transferred to Jim-Bob Oil Company on the wellbore schedule.

Completion filings report 3 formation tops, including Coleman Junction, Canyon, Gray Sd.

Its 2 leases have reported 2.18K barrels of oil and 27.9K mcf of gas since January 1993, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Jim-Bob Oil Company

Permitted by Bodan Oil & Gas Company; the EWA schedule now lists a different operator.

San Angelo, TX · P-5 Y, filed Apr 2, 2004 · 2 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleJim-Bob Oil Company
Production reportsBustamante Oil Companythrough Mar 2026
Latest permitBodan Oil & Gas CompanyOct 12, 1982

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,900
total depth, ft
1
permits on file
Oct 12, 1982
last permit issued
Sep 16, 1996
completed
2.18K
cumulative oil, bbl
27.9K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Sep 16, 1996
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Jameson Etal 1-A O-9-15127Bloodworth, N. (Canyon 5650)Bustamante Oil Company12.18K8.97KMar 2001 – Jul 2026
Jameson Etal 1-A G-9-105549Bloodworth, N. (Canyon 5650)Jim-Bob Oil Company1018.9KJan 1993 – Sep 2002

Oil, barrels lease total

Last 12 months 128 · prior 12 67(+91%)

0102030202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Bodan Oil & Gas CompanyJan 1993 → Jun 1996
  2. 2Bonell Oil & Gas Co.Jul 1996 → Dec 1996
  3. 3Bomar Operating Co., LCJan 1997 → Aug 1997
  4. 4Jim-Bob Oil CompanySep 1997 → Nov 2003
  5. 5O.G.P. Operating, Inc.Jan 2004 → May 2017
  6. 6Bustamante Oil CompanyMar 2020 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
174746-99DrillBodan Oil & Gas CompanyOct 12, 1982Oct 12, 1982—6,900

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-9-105549————
—— O-9-15127————

Formation tops

As filed on W-2/G-1. Subsea from 2,203 ft elevation.Download CSV →

FormationMD ftSubsea
Coleman Junction2,950-747
Coleman Junction3,000-797
CanyonCANYON SD5,190-2,987
Gray SD6,591-4,388

Perforations

Perforated and open-hole intervals.

FromToType
5,7925,797Perforated
6,5916,596Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62540311275 S
2.3755,800——
4.56,9007.8751,200 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 26, 2001Apr 13, 2001—
00May 11, 2001——
00May 22, 1997Oct 24, 1996—
00Jan 12, 1984May 31, 1983—
00Jan 12, 1984Dec 27, 1982—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/08131153, documented in the API reference.