WELL · 42-081-31657 · DISTRICT 7
Wilks #1
Coke County · Nipple Peak (Ellenburger) field · Vertical
Wilks #1 (API 42-081-31657) is a plugged well in Coke County, plugged May 20, 1997, last operated by Encore Energy Inc..
The RRC has issued one drilling permit (amended once), issued January 24, 1995, permitted to 6,600 ft.
It was permitted by Jla Resources Company and has since transferred to Encore Energy Inc. on the wellbore schedule.
Completion filings report 5 formation tops, including Canyon, Capps, Goen, Odom.
Its lease has reported 540 barrels of oil and 850 mcf of gas since May 1995, last reporting in June 1997.
Operator of record
Permitted by Jla Resources Company; the EWA schedule now lists a different operator.
Gainesville, TX · P-5 Y, filed Sep 11, 2015 · 24 permits on file · (940) 668-8100
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Encore Energy Inc. |
| Production reports | Jla Resources Companythrough Jan 1996 |
| Latest permit | Jla Resources CompanyJan 24, 1995 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 6,600
- total depth, ft
- 2
- permits on file
- Jan 24, 1995
- last permit issued
- Apr 2, 1995
- completed
- 540
- cumulative oil, bbl
- 850
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · May 1995 THROUGH Jun 1997
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Apr 2, 1995
- Shut in
- —
- Plugged
- May 20, 1997
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Wilks O-9-13789 | Nipple Peak (Ellenburger) | Encore Energy, Inc. | 1 | 540 | 850 | May 1995 – Jun 1997 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Jla Resources CompanyMay 1995 → Dec 1995
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 432005-98 | Drill | Jla Resources Company | Apr 27, 1995 | Jan 24, 1995 | Feb 21, 1995 | 6,600 |
| 432005-99 | Drill | Jla Resources Company | Jan 19, 1995 | Jan 24, 1995 | — | 6,600 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-9-13789 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Download CSV →
| Formation | MD ft |
|---|---|
| Canyon | 5,022 |
| Capps | 5,380 |
| Goen | 5,610 |
| Odom | 6,074 |
| Ellenburger | 6,416 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,419 | 6,442 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 316 | 12.25 | 200 S |
| 5.5 | 6,530 | 7.875 | 420 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 20, 1995 | May 30, 1995 | Yes |
| 00 | Jun 5, 1995 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-081-31657 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-081-31657 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/08131657, documented in the API reference.