WELL · 42-083-32294 · DISTRICT 7
Huckabee #5
Coleman County · Little Longhorn (Morris) field · Vertical
Huckabee #5 (API 42-083-32294) is a plugged well in Coleman County, plugged December 4, 1992, last operated by Marianas Operating CO..
The RRC has issued one drilling permit, issued October 17, 1980, permitted to 3,600 ft.
Completion filings report one formation top, including Morris.
Operator of record
- Based in
- Abilene, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Jun 13, 2000
- Permits on file
- 93
- Phone
- (325) 676-3070
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Marianas Operating Co. |
| Production reports | none |
| Latest permit | Marianas Operating Co.Oct 17, 1980 |
- 3,600
- total depth, ft
- 1
- permits on file
- Oct 17, 1980
- last permit issued
- Nov 10, 1980
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Mar 1993
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Nov 10, 1980
- Shut in
- —
- Plugged
- Dec 4, 1992
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 9 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Little Longhorn Unit O-8-24917 | Little Longhorn (Morris) | Lewis Operating Company | 9 | 0 | 0 | Jan 1993 – Mar 1993 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 95968-99 | Drill | Marianas Operating Co. | Oct 17, 1980 | Oct 17, 1980 | — | 3,600 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-24917 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,702 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Morris | 2,258 | -556 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,260 | 2,264 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 130 | 11 | 80 S |
| 8.625 | 130 | 12.25 | 80 S |
| 2.375 | 2,230 | — | — |
| 4.5 | 2,355 | 7.875 | 150 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 3, 1992 | Jul 28, 1992 | — |
| 00 | Dec 21, 1988 | Nov 28, 1988 | — |
| 00 | Jun 15, 1988 | Nov 24, 1980 | — |
| 00 | Jun 9, 1988 | — | — |
| 00 | Jan 12, 1984 | Nov 24, 1980 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-083-32294 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-083-32294 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 35.7K
- bbl, all reported
- Apr 1992
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000062587 | H-1 Injection | Plugged Dec 18, 1992 | 500 | 1,000 | 2,260–2,264 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 35,744(-100%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/08332294, documented in the API reference.