TEXAS · WELLS · COLEMAN COUNTY · API 42-083-33477 · DISTRICT 6E
McCain #1
Coleman County · Coleman County Regular field · Vertical
Mccain #1 (API 42-083-33477) is a plugged well in Coleman County, plugged November 1, 1991, last operated by Mccain Production Company Inc..
The RRC has issued 2 drilling permits between 1983 and 1987, permitted to 4,600 ft.
Completion filings report 8 formation tops, including Capps, Gardner Sand, Gardner, Gray Sand.
Operator of record
McCain Production Company Inc.
- Based in
- Spring, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Oct 4, 1990
- Permits on file
- 1
- Phone
- (713) 376-0270
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | McCain Production Company Inc. |
| Production reports | none |
| Latest permit | McCain Production Company, Inc.Sep 25, 1987 |
- 4,600
- total depth, ft
- 2
- permits on file
- Sep 25, 1987
- last permit issued
- Oct 28, 1987
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 28, 1987
- Shut in
- —
- Plugged
- Nov 1, 1991
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 335952-99 | Recompletion | McCain Production Company, Inc. | Sep 15, 1987 | Sep 25, 1987 | — | 4,580 |
| 192299-99 | Drill | Grand Banks Energy Company | Apr 21, 1983 | Apr 21, 1983 | Mar 23, 1983 | 4,600 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Oct 28, 1987 | McCain O-8-25819 | Coleman County Regular | McCain Production Company Inc. | Plugged | — |
| Mar 22, 1985 | McCain O-8-20745 | Hrubetz (Ellen) | McCain Production Company Inc. | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,000 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Capps | 3,548 | -1,548 |
| Gardner Sand | 3,728 | -1,728 |
| Gardner | 3,730 | -1,730 |
| Gray Sand | 3,898 | -1,898 |
| Gray | 3,900 | -1,900 |
| Caddo | 4,050 | -2,050 |
| Duffer | 4,310 | -2,310 |
| EllenburgerELLENBERGER | 4,428 | -2,428 |
| Ellenburger | 4,438 | -2,438 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,740 | 2,748 | Perforated |
| 4,310 | 4,320 | Perforated |
| 4,499 | 4,502 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 241 | 11 | 185 S |
| 8.625 | 250 | 11 | — |
| 8.625 | 250 | 12 | — |
| 4.5 | 4,580 | 7.875 | — |
| 4.5 | 4,581 | 7.875 | 700 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 12, 1990 | Apr 17, 1990 | Yes |
| 00 | May 24, 1990 | — | — |
| 00 | Apr 22, 1985 | Apr 3, 1985 | — |
| 00 | Mar 6, 1984 | Feb 6, 1984 | — |
| 00 | Feb 25, 1984 | Feb 6, 1984 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-083-33477 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-083-33477 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/08333477, documented in the API reference.