TEXAS · WELLS · COLEMAN COUNTY · O-8-22306 LEASE · API 42-083-34479 · DISTRICT 6E
Hennig McCord #3
Coleman County · United-Western (Jennings) field · Vertical
Hennig Mccord #3 (API 42-083-34479) is a plugged well in Coleman County, plugged July 12, 1991, last operated by Hennig W. R..
The RRC has issued 2 drilling permits in 1985, permitted to 4,600 ft.
It was permitted by Taylor County Operating, Inc. and has since transferred to Hennig W. R. on the wellbore schedule.
Completion filings report 5 formation tops, including Morris, Capps, Jennings, Caddo.
Operator of record
Permitted by Taylor County Operating, Inc.; the EWA schedule now lists a different operator.
- Based in
- Abilene, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Jul 20, 1993
- Permits on file
- 1
- Phone
- (325) 636-4471
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Hennig W. R. |
| Production reports | none |
| Latest permit | Taylor County Operating, Inc.Oct 11, 1985 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,600
- total depth, ft
- 2
- permits on file
- Oct 11, 1985
- last permit issued
- Jul 10, 1985
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jul 10, 1985
- Shut in
- —
- Plugged
- Jul 12, 1991
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| — O-8-22306 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 287296-99 | Drill | Taylor County Operating, Inc. | Aug 26, 1985 | Oct 11, 1985 | — | 4,600 |
| 277287-99 | Drill | Taylor County Operating, Inc. | May 31, 1985 | Jun 11, 1985 | — | 4,600 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Jul 10, 1985 | Hennig McCord O-8-22306 | United-Western (Jennings) | Hennig W. R. | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,140 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Morris | 3,235 | -1,095 |
| Capps | 3,280 | -1,140 |
| Jennings | 3,446 | -1,306 |
| Caddo | 3,740 | -1,600 |
| EllenburgerTOP ELLENBURGER | 4,210 | -2,070 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,446 | 3,450 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 183 | 11 | 100 S |
| 4.5 | 3,760 | 7.875 | 575 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 24, 1985 | Aug 26, 1985 | Yes |
| 00 | Oct 19, 1985 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-083-34479 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-083-34479 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/08334479, documented in the API reference.