WELL · 42-083-34673 · DISTRICT 7
Hudson A #4
Coleman County · Nena Gail (Gardner Lower) field · Vertical
Hudson A #4 (API 42-083-34673) is a plugged well in Coleman County, plugged March 25, 1994, last operated by Mid-Tex Energy Inc..
The RRC has issued one drilling permit, issued May 28, 1986, permitted to 3,600 ft.
Completion filings report 4 formation tops, including Morris, T/Capps, T/Gardner, Gray Lime.
Operator of record
- Based in
- Costa Mesa, CA
- P-5 status
- Inactive (I)
- P-5 last filed
- Sep 18, 1998
- Permits on file
- 102
- Phone
- (714) 444-1964
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Mid-Tex Energy Inc. |
| Production reports | none |
| Latest permit | Mid-Tex Energy Inc.May 28, 1986 |
- 3,600
- total depth, ft
- 1
- permits on file
- May 28, 1986
- last permit issued
- Aug 30, 1989
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH May 1994
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Aug 30, 1989
- Shut in
- —
- Plugged
- Mar 25, 1994
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Hudson "A" O-8-23919 | Nena Gail (Gardner, Lower) | Mid-Tex Energy Inc. | 1 | 0 | 0 | Jan 1993 – May 1994 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 302605-99 | Drill | Mid-Tex Energy Inc. | May 27, 1986 | May 28, 1986 | Jul 6, 1986 | 3,600 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-23919 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,937 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Morris | 2,930 | -993 |
| T/Capps | 2,946 | -1,009 |
| T/Gardner | 3,210 | -1,273 |
| Gray Lime | 3,410 | -1,473 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,216 | 3,219 | Perforated |
| 3,226 | 3,234 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 255 | 12.25 | 175 S |
| 4.5 | 3,307 | 7.875 | 170 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 5, 1989 | Sep 21, 1989 | — |
| 00 | Sep 9, 1986 | Sep 2, 1986 | Yes |
| 00 | Sep 8, 1986 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-083-34673 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-083-34673 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 28.9K
- bbl, last 12 reported months
- 224K
- bbl, all reported
- Apr 1994
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000070098 | H-1 Injection | Plugged Apr 22, 1994 | 1,000 | 1,600 | 3,216–3,234 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 28,860 · prior 12 52,800(-45%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/08334673, documented in the API reference.