WELL · 42-083-35157 · DISTRICT 7

CJC Unit #104

Plugged

Coleman County · C.J.C. (Strawn) field  · Vertical

Cjc Unit #104 (API 42-083-35157) is a plugged well in Coleman County, plugged April 28, 1994, last operated by Leclair Operating CO. Inc..

The RRC has issued one drilling permit, issued May 23, 1990, permitted to 3,900 ft.

Completion filings report 7 formation tops, including Bcj, B/S Crk. Ls., Bunger, Palo Pinto.

Its lease has reported 1.74K barrels of oil and 16 mcf of gas since January 1993, last reporting in August 1994. The lease carries 16 wells, so these are lease totals, not this well alone.

Operator of record

Leclair Operating Co. Inc.

Based in
Abilene, TX
P-5 status
Inactive (I)
P-5 last filed
Jun 5, 2013
Permits on file
351
Phone
(325) 698-5100

SOURCE · RRC EWA WELLBORE SCHEDULE

3,900
total depth, ft
1
permits on file
May 23, 1990
last permit issued
Jul 27, 1990
completed
1.74K
cumulative oil, bbl
16
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 1994

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 27, 1990
Shut in
—
Plugged
Apr 28, 1994

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 16 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
CJC Unit O-8-25445C.J.C. (Strawn)Leclair Operating Co., Inc.161.74K16Jan 1993 – Aug 1994

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Leclair Operating Co., Inc.Jan 1993 → Dec 1993

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
373656-99DrillLeclair Operating Co., Inc.May 21, 1990May 23, 1990—3,900

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-25445————

Formation tops

As filed on W-2/G-1. Subsea from 2,061 ft elevation.Download CSV →

FormationMD ftSubsea
BCJ1,172889
B/S Crk. Ls.1,658403
Bunger2,648-587
Palo Pinto2,990-929
Upper Capps3,306-1,245
Lower Capps3,368-1,307
Gardner3,550-1,489

Perforations

Perforated and open-hole intervals.

FromToType
3,4863,496Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62525211115 S
4.53,7408.625550 S
4.5—8.625400 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 13, 1990Oct 9, 1990Yes
00Oct 25, 1990——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

4.36K
bbl, last 12 reported months
214K
bbl, all reported
Apr 1994
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000074277H-1 InjectionPlugged May 9, 19945001,2003,486–3,496

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 4,360 · prior 12 57,225(-92%)

010K20K19931994

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/08335157, documented in the API reference.